IAC logo
IAC Assessment: CO0335
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0335
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1995
Principal Product Injection molded plastic parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 40,000
Annual Production 480,000 Pieces
Production Hrs. Annual 7,488
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,588 2,126,612 kWh $0.06
Natural Gas $3,949 972 MMBtu $4.06
TOTAL ENERGY COSTS $135,807
RECOMMENDED SAVINGS* $8,010 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,640
#|Description Savings
Cost
Status Electricity Usage Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ gal $ lb $ $
01: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$2,440
Cost:
$80
- - - - - - $2,440 - -
-
kWh
-
-
gal
-
-
lb
$2,440
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,170
Cost:
$5,580
$1,170 34,291 - - - - - - $1,170
34,291
kWh
-
-
gal
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,740
Cost:
$4,520
$1,740 34,877 - - - - - - $1,740
34,877
kWh
-
-
gal
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,160
Cost:
-
- - - - $1,160 51,000 - - -
-
kWh
-
-
gal
$1,160
51,000
lb
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$490
Cost:
$2,080
$490 10,258 - - - - - - $490
10,258
kWh
-
-
gal
-
-
lb
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$400
Cost:
$840
$400 9,379 - - - - - - $400
9,379
kWh
-
-
gal
-
-
lb
-
-
$
07: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$370
Cost:
$530
- - $370 170 - - - - -
-
kWh
$370
170
gal
-
-
lb
-
-
$
08: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$240
Cost:
$80
- - - - - 400 $240 - -
-
kWh
-
-
gal
-
400
lb
$240
-
$
TOTAL RECOMMENDED Savings:
$8,010
Cost:
$13,710
$3,800 88,805 $370 170 $1,160 51,400 $2,680 - $3,800
88,805
kWh
$370
170
gal
$1,160
51,400
lb
$2,680
-
$
TOTAL IMPLEMENTED Savings:
$7,640
Cost:
$13,180
$3,800 88,805 - - $1,160 51,400 $2,680 - $3,800
88,805
kWh
-
-
gal
$1,160
51,400
lb
$2,680
-
$
Savings
Cost
$ kWh $ gal $ lb $ $
Electricity Usage Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost