IAC logo
IAC Assessment: CO0336
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0336
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1995
Principal Product Touchless Car Washers
NAICS n/a
SIC 3589 - Service Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 75,000
Annual Production 500 Pieces
Production Hrs. Annual 4,420
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,414 882,181 kWh $0.07
Natural Gas $20,602 4,730 MMBtu $4.36
TOTAL ENERGY COSTS $81,506
RECOMMENDED SAVINGS* $12,770 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,090
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Ancillary Material Cost Electricity Usage Natural Gas Other Liquid (haz) Ancillary Material Cost
$ kWh $ MMBtu $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,020
Cost:
$22,280
$7,020 85,580 - - - - - - $7,020
85,580
kWh
-
-
MMBtu
-
-
gal
-
-
$
02: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$1,490
Cost:
$40
- - - - - - $1,490 - -
-
kWh
-
-
MMBtu
-
-
gal
$1,490
-
$
03: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$1,510
Cost:
$340
$(-10) (-293) - - $250 350 $1,270 - $(-10)
(-293)
kWh
-
-
MMBtu
$250
350
gal
$1,270
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$920
Cost:
$980
$920 15,826 - - - - - - $920
15,826
kWh
-
-
MMBtu
-
-
gal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$790
Cost:
$130
$790 15,826 - - - - - - $790
15,826
kWh
-
-
MMBtu
-
-
gal
-
-
$
06: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$380
Cost:
$500
- - - - - - $380 - -
-
kWh
-
-
MMBtu
-
-
gal
$380
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$360
Cost:
$690
- - $360 84 - - - - -
-
kWh
$360
84
MMBtu
-
-
gal
-
-
$
08: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$300
Cost:
-
- - - - - - $300 - -
-
kWh
-
-
MMBtu
-
-
gal
$300
-
$
TOTAL RECOMMENDED Savings:
$12,770
Cost:
$24,960
$8,720 116,939 $360 84 $250 350 $3,440 - $8,720
116,939
kWh
$360
84
MMBtu
$250
350
gal
$3,440
-
$
TOTAL IMPLEMENTED Savings:
$9,090
Cost:
$24,080
$8,730 117,232 $360 84 - - - - $8,730
117,232
kWh
$360
84
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ $
Electricity Usage Natural Gas Other Liquid (haz) Ancillary Material Cost Electricity Usage Natural Gas Other Liquid (haz) Ancillary Material Cost