Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1995 |
Principal Product | Touchless Car Washers |
NAICS | n/a |
SIC | 3589 - Service Industry Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 230 |
Plant Area (Sq.Ft.) | 75,000 |
Annual Production | 500 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $57,414 | 882,181 | kWh | $0.07 |
Natural Gas | $20,602 | 4,730 | MMBtu | $4.36 |
TOTAL ENERGY COSTS | $81,506 | |||
RECOMMENDED SAVINGS* | $12,770 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,090 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Ancillary Material Cost | Electricity Usage | Natural Gas | Other Liquid (haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,020 Cost: $22,280 |
$7,020 | 85,580 | - | - | - | - | - | - |
$7,020 85,580 kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $1,490 Cost: $40 |
- | - | - | - | - | - | $1,490 | - |
- - kWh |
- - MMBtu |
- - gal |
$1,490 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $1,510 Cost: $340 |
$(-10) | (-293) | - | - | $250 | 350 | $1,270 | - |
$(-10) (-293) kWh |
- - MMBtu |
$250 350 gal |
$1,270 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $920 Cost: $980 |
$920 | 15,826 | - | - | - | - | - | - |
$920 15,826 kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $790 Cost: $130 |
$790 | 15,826 | - | - | - | - | - | - |
$790 15,826 kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $380 Cost: $500 |
- | - | - | - | - | - | $380 | - |
- - kWh |
- - MMBtu |
- - gal |
$380 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $360 Cost: $690 |
- | - | $360 | 84 | - | - | - | - |
- - kWh |
$360 84 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $300 Cost: - |
- | - | - | - | - | - | $300 | - |
- - kWh |
- - MMBtu |
- - gal |
$300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,770 Cost: $24,960 |
$8,720 | 116,939 | $360 | 84 | $250 | 350 | $3,440 | - | $8,720 116,939 kWh |
$360 84 MMBtu |
$250 350 gal |
$3,440 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,090 Cost: $24,080 |
$8,730 | 117,232 | $360 | 84 | - | - | - | - | $8,730 117,232 kWh |
$360 84 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Ancillary Material Cost | Electricity Usage | Natural Gas | Other Liquid (haz) | Ancillary Material Cost |