IAC Assessment: CO0342
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0342
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1995
Principal Product Printed circuit boards
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $5,000,000-$10,000,000
# of Employees 72
Plant Area (Sq.Ft.) 30,000
Annual Production 979,400 Pieces
Production Hrs. Annual 6,864
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,946 1,706,331 kWh $0.07
Natural Gas $5,723 1,307 MMBtu $4.38
TOTAL ENERGY COSTS $198,429
RECOMMENDED SAVINGS* $161,100 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,450
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost Electricity Usage Natural Gas Water Disposal Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost
$ kWh $ MMBtu $ Tgal $ gal $ lb $ $
01: 3.5242 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE Savings:
$96,090
Cost:
$153,400
- - - - $8,640 616,800 $13,230 19,400 - - $74,220 - -
-
kWh
-
-
MMBtu
$8,640
616,800
Tgal
$13,230
19,400
gal
-
-
lb
$74,220
-
$
02: 3.3127 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS Savings:
$56,560
Cost:
$174,500
- - - - $51,500 4,494,000 - - $2,030 20,340 $3,030 - -
-
kWh
-
-
MMBtu
$51,500
4,494,000
Tgal
-
-
gal
$2,030
20,340
lb
$3,030
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,910
Cost:
$13,270
$4,910 89,977 - - - - - - - - - - $4,910
89,977
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,190
Cost:
$1,240
$1,190 24,326 - - - - - - - - - - $1,190
24,326
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,000
Cost:
$720
$1,000 19,930 - - - - - - - - - - $1,000
19,930
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$820
Cost:
$600
- - $820 187 - - - - - - - - -
-
kWh
$820
187
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$530
Cost:
-
$530 11,137 - - - - - - - - - - $530
11,137
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$161,100
Cost:
$343,730
$7,630 145,370 $820 187 $60,140 5,110,800 $13,230 19,400 $2,030 20,340 $77,250 - $7,630
145,370
kWh
$820
187
MMBtu
$60,140
5,110,800
Tgal
$13,230
19,400
gal
$2,030
20,340
lb
$77,250
-
$
TOTAL IMPLEMENTED Savings:
$7,450
Cost:
$15,110
$6,630 125,440 $820 187 - - - - - - - - $6,630
125,440
kWh
$820
187
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ gal $ lb $ $
Electricity Usage Natural Gas Water Disposal Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost Electricity Usage Natural Gas Water Disposal Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost