Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1995 |
Principal Product | Integrated microcircuits |
NAICS | n/a |
SIC | 3674 - Semiconductors And Related Devices |
Sales | $100,000,000-$500,000,000 |
# of Employees | 600 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 100,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $907,143 | 23,922,919 | kWh | $0.04 |
Natural Gas | $150,248 | 46,805 | MMBtu | $3.21 |
TOTAL ENERGY COSTS | $1,161,158 | |||
RECOMMENDED SAVINGS* | $52,310 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $44,740 |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Disposal | Water Consumption | Electricity Usage | Water Disposal | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $20,640 Cost: $54,100 |
$20,640 | 499,121 | - | - | - | - |
$20,640 499,121 kWh |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $18,410 Cost: $2,190 |
- | - | $8,460 | 6,938,000 | $9,950 | - |
- - kWh |
$8,460 6,938,000 Tgal |
$9,950 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $5,690 Cost: $7,000 |
$5,690 | 147,714 | - | - | - | - |
$5,690 147,714 kWh |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,030 Cost: $2,280 |
$3,030 | 148,007 | - | - | - | - |
$3,030 148,007 kWh |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,860 Cost: $4,470 |
$1,860 | 44,842 | - | - | - | - |
$1,860 44,842 kWh |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,690 Cost: $470 |
$1,690 | 46,600 | - | - | - | - |
$1,690 46,600 kWh |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $990 Cost: $10,410 |
$990 | 24,033 | - | - | - | - |
$990 24,033 kWh |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $52,310 Cost: $80,920 |
$33,900 | 910,317 | $8,460 | 6,938,000 | $9,950 | - | $33,900 910,317 kWh |
$8,460 6,938,000 Tgal |
$9,950 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $44,740 Cost: $63,290 |
$26,330 | 646,835 | $8,460 | 6,938,000 | $9,950 | - | $26,330 646,835 kWh |
$8,460 6,938,000 Tgal |
$9,950 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Disposal | Water Consumption | Electricity Usage | Water Disposal | Water Consumption |