IAC logo
IAC Assessment: CO0355
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0355
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1996
Principal Product plastic lined vessels and castings
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 60,700
Annual Production 350,000 Pounds
Production Hrs. Annual 2,600
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,335 668,816 kWh $0.03
Electricity Demand $21,878 3,408 kW-months/year $6.42
Electricity Fees $3 - $ -
Natural Gas $25,040 4,541 MMBtu $5.51
TOTAL ENERGY COSTS $71,036
RECOMMENDED SAVINGS* $7,502 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,040
Cost:
$410
$1,640 47,186 $1,400 217 - - - - - - - - $1,640
47,186
kWh
$1,400
217
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,850
Cost:
$250
- - - - - - - - $1,850 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$1,850
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$768
Cost:
$1,733
$415 12,016 $353 55 - - - - - - - - $415
12,016
kWh
$353
55
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,650
Cost:
$600
- - - - $1,650 299 - - - - - - -
-
kWh
-
-
kW-months/year
$1,650
299
MMBtu
-
-
gal
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$74
Cost:
$220
$40 1,172 $34 5 - - - - - - - - $40
1,172
kWh
$34
5
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$430
Cost:
$470
$230 6,741 $200 31 - - - - - - - - $230
6,741
kWh
$200
31
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
07: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$(-10)
Cost:
-
- - - - - - $50 15 - - $(-60) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$50
15
gal
-
-
$
$(-60)
-
$
08: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$(-300)
Cost:
-
- - - - - - $240 80 - - $(-540) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$240
80
gal
-
-
$
$(-540)
-
$
TOTAL RECOMMENDED Savings:
$7,502
Cost:
$3,683
$2,325 67,115 $1,987 308 $1,650 299 $290 95 $1,850 - $(-600) - $2,325
67,115
kWh
$1,987
308
kW-months/year
$1,650
299
MMBtu
$290
95
gal
$1,850
-
$
$(-600)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Ancillary Material Cost