IAC logo
IAC Assessment: CO0358
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0358
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1996
Principal Product agricultural equipment
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 238,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 2,340
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,062 1,166,471 kWh $0.04
Electricity Demand $18,559 2,830 kW-months/year $6.56
Natural Gas $12,428 2,582 MMBtu $4.81
TOTAL ENERGY COSTS $78,279
RECOMMENDED SAVINGS* $11,049 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,072
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,490
Cost:
$12,750
$7,060 174,678 $5,060 772 $(-4,630) (-982) - - $7,060
174,678
kWh
$5,060
772
kW-months/year
$(-4,630)
(-982)
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,072
Cost:
$2,338
$1,714 42,497 $1,358 207 - - - - $1,714
42,497
kWh
$1,358
207
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$240
Cost:
$300
- - - - $240 54 - - -
-
kWh
-
-
kW-months/year
$240
54
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$220
Cost:
$520
$160 3,810 $60 10 - - - - $160
3,810
kWh
$60
10
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$37
Cost:
$137
$22 879 $15 1 - - - - $22
879
kWh
$15
1
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$190
Cost:
$60
$140 3,517 $50 7 - - - - $140
3,517
kWh
$50
7
kW-months/year
-
-
MMBtu
-
-
$
07: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$(-200)
Cost:
$260
- - - - - - $(-200) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-200)
-
$
TOTAL RECOMMENDED Savings:
$11,049
Cost:
$16,365
$9,096 225,381 $6,543 997 $(-4,390) (-928) $(-200) - $9,096
225,381
kWh
$6,543
997
kW-months/year
$(-4,390)
(-928)
MMBtu
$(-200)
-
$
TOTAL IMPLEMENTED Savings:
$3,072
Cost:
$2,338
$1,714 42,497 $1,358 207 - - - - $1,714
42,497
kWh
$1,358
207
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost