IAC logo
IAC Assessment: CO0367
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0367
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1996
Principal Product fabric tops for sport utility vehicles
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 214,357
Annual Production 200,000 Pieces
Production Hrs. Annual 2,184
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,387 2,569,754 kWh $0.03
Electricity Demand $84,183 8,285 kW-months/year $10.16
Natural Gas $35,664 9,184 MMBtu $3.88
TOTAL ENERGY COSTS $212,594
RECOMMENDED SAVINGS* $16,778 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,418
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes By-product Production
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,771
Cost:
$13,736
$3,473 103,458 $4,298 423 - - - - - - $3,473
103,458
kWh
$4,298
423
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$6,360
Cost:
$2,000
- - - - $6,360 24,000 - - - - -
-
kWh
-
-
kW-months/year
$6,360
24,000
lb
-
-
$
-
-
$
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,440
Cost:
$8,000
- - - - - - $(-360) - $1,800 - -
-
kWh
-
-
kW-months/year
-
-
lb
$(-360)
-
$
$1,800
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,170
Cost:
$240
$440 13,189 $730 72 - - - - - - $440
13,189
kWh
$730
72
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$37
Cost:
$52
$18 586 $19 2 - - - - - - $18
586
kWh
$19
2
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,778
Cost:
$24,028
$3,931 117,233 $5,047 497 $6,360 24,000 $(-360) - $1,800 - $3,931
117,233
kWh
$5,047
497
kW-months/year
$6,360
24,000
lb
$(-360)
-
$
$1,800
-
$
TOTAL IMPLEMENTED Savings:
$10,418
Cost:
$22,028
$3,931 117,233 $5,047 497 - - $(-360) - $1,800 - $3,931
117,233
kWh
$5,047
497
kW-months/year
-
-
lb
$(-360)
-
$
$1,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes By-product Production