Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1996 |
Principal Product | plumbing fixtures |
NAICS | n/a |
SIC | 3432 - Plumbing Fixture Fittings And Trim |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 800,000 Pieces |
Production Hrs. Annual | 6,656 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $74,995 | 1,515,533 | kWh | $0.05 |
Electricity Fees | $183 | - | $ | - |
Natural Gas | $21,047 | 5,659 | MMBtu | $3.72 |
TOTAL ENERGY COSTS | $96,945 | |||
RECOMMENDED SAVINGS* | $38,845 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $975 |
#|Description |
Savings Cost |
Status | Electricity Usage | Other Liquid (haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Other Liquid (haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $29,710 Cost: $500 |
- | - | - | - | $29,710 | - | - | - |
- - kWh |
- - gal |
$29,710 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,770 Cost: $23,300 |
$7,770 | 157,093 | - | - | - | - | - | - |
$7,770 157,093 kWh |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $319 Cost: $623 |
$319 | 6,448 | - | - | - | - | - | - |
$319 6,448 kWh |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $156 Cost: $217 |
$156 | 3,224 | - | - | - | - | - | - |
$156 3,224 kWh |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $500 Cost: $60 |
$500 | 9,965 | - | - | - | - | - | - |
$500 9,965 kWh |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $390 Cost: $1,370 |
- | - | $700 | 54 | - | - | $(-310) | - |
- - kWh |
$700 54 gal |
- - $ |
$(-310) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $38,845 Cost: $26,070 |
$8,745 | 176,730 | $700 | 54 | $29,710 | - | $(-310) | - | $8,745 176,730 kWh |
$700 54 gal |
$29,710 - $ |
$(-310) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $975 Cost: $900 |
$975 | 19,637 | - | - | - | - | - | - | $975 19,637 kWh |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Other Liquid (haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Other Liquid (haz) | Administrative Changes | Ancillary Material Cost |