Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1996 |
Principal Product | dried poultry and meat products |
NAICS | n/a |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $10,000,000-$50,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 4,140,000 Pounds |
Production Hrs. Annual | 6,864 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $110,367 | 2,385,111 | kWh | $0.05 |
Electricity Fees | $(-2,158) | - | $ | - |
Natural Gas | $158,185 | 62,060 | MMBtu | $2.55 |
TOTAL ENERGY COSTS | $292,394 | |||
RECOMMENDED SAVINGS* | $13,325 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,895 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | By-product Production | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1172 REVISE RAW MATERIAL SPECS |
Savings: $8,100 Cost: $1,000 |
- | - | - | - | $7,000 | 280,000 | $(-3,800) | - | $4,900 | - |
- - kWh |
- - MMBtu |
$7,000 280,000 lb |
$(-3,800) - $ |
$4,900 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,840 Cost: $7,126 |
$1,840 | 40,739 | - | - | - | - | - | - | - | - |
$1,840 40,739 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,720 Cost: $1,500 |
- | - | $1,720 | 690 | - | - | - | - | - | - |
- - kWh |
$1,720 690 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $800 Cost: $420 |
$800 | 17,585 | - | - | - | - | - | - | - | - |
$800 17,585 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $105 Cost: $290 |
$105 | 2,345 | - | - | - | - | - | - | - | - |
$105 2,345 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $430 Cost: $1,390 |
$430 | 9,672 | - | - | - | - | - | - | - | - |
$430 9,672 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $200 Cost: $120 |
$200 | 4,396 | - | - | - | - | - | - | - | - |
$200 4,396 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $130 Cost: $260 |
- | - | $130 | 52 | - | - | - | - | - | - |
- - kWh |
$130 52 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $13,325 Cost: $12,106 |
$3,375 | 74,737 | $1,850 | 742 | $7,000 | 280,000 | $(-3,800) | - | $4,900 | - | $3,375 74,737 kWh |
$1,850 742 MMBtu |
$7,000 280,000 lb |
$(-3,800) - $ |
$4,900 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,895 Cost: $10,726 |
$3,175 | 70,341 | $1,720 | 690 | - | - | - | - | - | - | $3,175 70,341 kWh |
$1,720 690 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | By-product Production | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | By-product Production |