IAC logo
IAC Assessment: CO0375
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0375
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1996
Principal Product bread and rolls
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 86,000
Annual Production 28,000,000 Pounds
Production Hrs. Annual 3,900
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,492 3,128,957 kWh $0.03
Electricity Demand $71,580 6,465 kW-months/year $11.07
Electricity Fees $(-1,382) - $ -
Natural Gas $43,259 19,633 MMBtu $2.20
TOTAL ENERGY COSTS $198,939
RECOMMENDED SAVINGS* $5,344 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,614
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,740
Cost:
$10,200
- - - - $1,740 791 - - - - -
-
kWh
-
-
kW-months/year
$1,740
791
MMBtu
-
-
gal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,205
Cost:
$2,445
$651 24,033 $554 50 - - - - - - $651
24,033
kWh
$554
50
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$760
Cost:
$150
$340 12,603 $420 39 - - - - - - $340
12,603
kWh
$420
39
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$660
Cost:
$1,420
- - - - - - $970 66 $(-310) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$970
66
gal
$(-310)
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$610
Cost:
$30
- - - - $610 275 - - - - -
-
kWh
-
-
kW-months/year
$610
275
MMBtu
-
-
gal
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$330
Cost:
$460
- - - - $330 149 - - - - -
-
kWh
-
-
kW-months/year
$330
149
MMBtu
-
-
gal
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$39
Cost:
$92
$17 586 $22 2 - - - - - - $17
586
kWh
$22
2
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$5,344
Cost:
$14,797
$1,008 37,222 $996 91 $2,680 1,215 $970 66 $(-310) - $1,008
37,222
kWh
$996
91
kW-months/year
$2,680
1,215
MMBtu
$970
66
gal
$(-310)
-
$
TOTAL IMPLEMENTED Savings:
$2,614
Cost:
$2,717
$1,008 37,222 $996 91 $610 275 - - - - $1,008
37,222
kWh
$996
91
kW-months/year
$610
275
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Ancillary Material Cost