IAC logo
IAC Assessment: CO0379
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0379
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1996
Principal Product skis and snowboards
NAICS n/a
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 55,000
Annual Production 50,000 Pieces
Production Hrs. Annual 5,064
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,893 1,518,464 kWh $0.03
Electricity Demand $50,357 4,293 kW-months/year $11.73
Electricity Fees $299 - $ -
Natural Gas $20,588 5,485 MMBtu $3.75
TOTAL ENERGY COSTS $118,427
RECOMMENDED SAVINGS* $106,763 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $103,453
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product By-product Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ $
01: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$37,440
Cost:
$48,250
- - - - - - - - - - $37,440 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$37,440
-
$
-
-
$
02: 4.1240 INSTALL CONTINUOUS LUBRICATION EQUIPMENT Savings:
$32,640
Cost:
$3,000
- - - - - - - - - - $32,640 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$32,640
-
$
-
-
$
03: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$29,180
Cost:
$270
- - - - - - - - - - $29,180 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$29,180
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,307
Cost:
$5,236
$533 17,585 $774 66 - - - - - - - - - - $533
17,585
kWh
$774
66
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,260
Cost:
$400
- - - - - - - - $2,260 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$2,260
-
$
-
-
$
-
-
$
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,810
Cost:
$1,560
$20 586 - - $1,790 476 - - - - - - - - $20
586
kWh
-
-
kW-months/year
$1,790
476
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,500
Cost:
$8,000
- - - - - - $(-170) - - - - - $1,670 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-170)
-
$
-
-
$
-
-
$
$1,670
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$580
Cost:
$400
$300 9,965 $280 24 - - - - - - - - - - $300
9,965
kWh
$280
24
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$46
Cost:
$25
$24 879 $22 2 - - - - - - - - - - $24
879
kWh
$22
2
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$106,763
Cost:
$67,141
$877 29,015 $1,076 92 $1,790 476 $(-170) - $2,260 - $99,260 - $1,670 - $877
29,015
kWh
$1,076
92
kW-months/year
$1,790
476
MMBtu
$(-170)
-
$
$2,260
-
$
$99,260
-
$
$1,670
-
$
TOTAL IMPLEMENTED Savings:
$103,453
Cost:
$57,581
$857 28,429 $1,076 92 - - - - $2,260 - $99,260 - - - $857
28,429
kWh
$1,076
92
kW-months/year
-
-
MMBtu
-
-
$
$2,260
-
$
$99,260
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product By-product Production