IAC logo
IAC Assessment: CO0380
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0380
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1996
Principal Product telephone directories
NAICS n/a
SIC 2741 - Miscellaneous Publishing
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 270,000
Annual Production 50,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $325,917 19,966,003 kWh $0.02
Electricity Demand $612,049 39,247 kW-months/year $15.59
Electricity Fees $264 - $ -
Natural Gas $129,652 37,963 MMBtu $3.42
TOTAL ENERGY COSTS $1,073,552
RECOMMENDED SAVINGS* $18,694 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,603
Cost:
$27,027
$3,723 228,605 $4,880 313 - - - - - - $3,723
228,605
kWh
$4,880
313
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$761
Cost:
$883
$353 21,688 $408 26 - - - - - - $353
21,688
kWh
$408
26
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,320
Cost:
$2,700
$1,440 88,218 $1,880 121 - - - - - - $1,440
88,218
kWh
$1,880
121
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,690
Cost:
$2,180
$1,170 72,098 $1,520 98 - - - - - - $1,170
72,098
kWh
$1,520
98
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$2,070
Cost:
$3,520
- - - - $3,240 520 - - $(-1,170) - -
-
kWh
-
-
kW-months/year
$3,240
520
gal
-
-
lb
$(-1,170)
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,250
Cost:
-
- - - - - - $1,250 450 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$1,250
450
lb
-
-
$
TOTAL RECOMMENDED Savings:
$18,694
Cost:
$36,310
$6,686 410,609 $8,688 558 $3,240 520 $1,250 450 $(-1,170) - $6,686
410,609
kWh
$8,688
558
kW-months/year
$3,240
520
gal
$1,250
450
lb
$(-1,170)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost