IAC logo
IAC Assessment: CO0381
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0381
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1997
Principal Product ice cream and yogurt
NAICS n/a
SIC 2024 - Ice Cream And Frozen Desserts
Sales $10,000,000-$50,000,000
# of Employees 27
Plant Area (Sq.Ft.) 25,700
Annual Production 4,000,000 Thousand Gallons
Production Hrs. Annual 3,510
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,261 3,155,920 kWh $0.03
Electricity Demand $116,780 9,712 kW-months/year $12.02
Electricity Fees $(-3) - $ -
Natural Gas $21,759 5,978 MMBtu $3.64
TOTAL ENERGY COSTS $275,407
RECOMMENDED SAVINGS* $90,458 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $89,688
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material By-product Production
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$689
Cost:
$1,914
$267 9,672 $422 35 - - - - - - - - $267
9,672
kWh
$422
35
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$179
Cost:
$602
$99 3,517 $80 7 - - - - - - - - $99
3,517
kWh
$80
7
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,020
Cost:
$190
$410 14,947 $610 51 - - - - - - - - $410
14,947
kWh
$610
51
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$770
Cost:
$510
$310 11,137 $460 38 - - - - - - - - $310
11,137
kWh
$460
38
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$12,550
Cost:
$12,500
- - - - $11,960 670,000 - - - - $590 - -
-
kWh
-
-
kW-months/year
$11,960
670,000
lb
-
-
$
-
-
$
$590
-
$
06: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$75,250
Cost:
$320,000
- - - - - - $67,420 - $7,830 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$67,420
-
$
$7,830
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$90,458
Cost:
$335,716
$1,086 39,273 $1,572 131 $11,960 670,000 $67,420 - $7,830 - $590 - $1,086
39,273
kWh
$1,572
131
kW-months/year
$11,960
670,000
lb
$67,420
-
$
$7,830
-
$
$590
-
$
TOTAL IMPLEMENTED Savings:
$89,688
Cost:
$335,206
$776 28,136 $1,112 93 $11,960 670,000 $67,420 - $7,830 - $590 - $776
28,136
kWh
$1,112
93
kW-months/year
$11,960
670,000
lb
$67,420
-
$
$7,830
-
$
$590
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material By-product Production