IAC logo
IAC Assessment: CO0382
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0382
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1997
Principal Product soft drinks
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 176,000
Annual Production 372,000,000 Pieces
Production Hrs. Annual 6,820
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,942 4,789,566 kWh $0.03
Electricity Demand $118,090 10,033 kW-months/year $11.77
Natural Gas $87,442 28,826 MMBtu $3.03
TOTAL ENERGY COSTS $425,374
RECOMMENDED SAVINGS* $349,100 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,356
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Water Consumption Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Water Consumption Primary Product By-product Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb $ $ $ $ $ Tgal $ $ $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$12,200
Cost:
$1,700
$6,920 254,982 $5,280 449 - - - - - - - - - - - - - - - - - - $6,920
254,982
kWh
$5,280
449
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,662
Cost:
$21,489
$4,142 152,696 $2,520 214 - - - - - - - - - - - - - - - - - - $4,142
152,696
kWh
$2,520
214
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$424
Cost:
$1,142
$240 8,792 $184 16 - - - - - - - - - - - - - - - - - - $240
8,792
kWh
$184
16
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,260
Cost:
$7,500
- - - - $3,260 1,076 - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,260
1,076
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,430
Cost:
$430
$810 29,894 $620 53 - - - - - - - - - - - - - - - - - - $810
29,894
kWh
$620
53
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$11,220
Cost:
$2,740
- - - - - - $7,290 3,740,000 - - - - - - - - $3,930 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,290
3,740,000
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
$3,930
-
Tgal
-
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$11,210
Cost:
$24,250
$(-20) (-586) - - - - - - - - - - $(-2,570) - - - - - - - $13,800 - $(-20)
(-586)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$(-2,570)
-
$
-
-
$
-
-
Tgal
-
-
$
$13,800
-
$
08: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED Savings:
$1,430
Cost:
$5,000
- - - - - - $1,430 7,670 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,430
7,670
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
09: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$264
Cost:
$1,790
- - - - - - - - $539 56 $(-16) (-8) - - $(-259) - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$539
56
gal
$(-16)
(-8)
lb
-
-
$
$(-259)
-
$
-
-
Tgal
-
-
$
-
-
$
10: 4.6240 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME Savings:
$301,000
Cost:
$25,000
- - - - - - - - - - - - $(-38,000) - - - - - $339,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$(-38,000)
-
$
-
-
$
-
-
Tgal
$339,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$349,100
Cost:
$91,041
$12,092 445,778 $8,604 732 $3,260 1,076 $8,720 3,747,670 $539 56 $(-16) (-8) $(-40,570) - $(-259) - $3,930 - $339,000 - $13,800 - $12,092
445,778
kWh
$8,604
732
kW-months/year
$3,260
1,076
MMBtu
$8,720
3,747,670
Tgal
$539
56
gal
$(-16)
(-8)
lb
$(-40,570)
-
$
$(-259)
-
$
$3,930
-
Tgal
$339,000
-
$
$13,800
-
$
TOTAL IMPLEMENTED Savings:
$33,356
Cost:
$54,011
$12,092 445,778 $8,604 732 - - $1,430 7,670 - - - - $(-2,570) - - - - - - - $13,800 - $12,092
445,778
kWh
$8,604
732
kW-months/year
-
-
MMBtu
$1,430
7,670
Tgal
-
-
gal
-
-
lb
$(-2,570)
-
$
-
-
$
-
-
Tgal
-
-
$
$13,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb $ $ $ $ $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Water Consumption Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Water Consumption Primary Product By-product Production