IAC Assessment: CO0383
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0383
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1997
Principal Product automotive ic sensors
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 111,000
Annual Production 6,600 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $324,797 11,693,728 kWh $0.03
Electricity Demand $145,714 19,480 kW-months/year $7.48
Electricity Fees $14,520 - $ -
Natural Gas $100,212 25,892 MMBtu $3.87
TOTAL ENERGY COSTS $590,243
RECOMMENDED SAVINGS* $1,985,777 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,887
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Water Consumption Increase in Production Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Water Consumption Increase in Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ Tgal $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,660
Cost:
$28,150
$4,910 174,091 $2,750 367 - - - - - - - - - - $4,910
174,091
kWh
$2,750
367
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
%
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$557
Cost:
$980
$409 14,361 $148 20 - - - - - - - - - - $409
14,361
kWh
$148
20
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
%
03: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$3,770
Cost:
$5,700
- - - - $3,770 972 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,770
972
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
%
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$350
Cost:
$590
$260 9,086 $90 12 - - - - - - - - - - $260
9,086
kWh
$90
12
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
%
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,320
Cost:
$1,580
- - - - - - $340 473,200 - - $980 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$340
473,200
Tgal
-
-
lb
$980
-
Tgal
-
-
%
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,120
Cost:
$160
- - - - - - - - $1,120 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,120
-
lb
-
-
Tgal
-
-
%
07: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$1,971,000
Cost:
$100,000
- - - - - - - - - - - - $1,971,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
Tgal
$1,971,000
-
%
TOTAL RECOMMENDED Savings:
$1,985,777
Cost:
$137,160
$5,579 197,538 $2,988 399 $3,770 972 $340 473,200 $1,120 - $980 - $1,971,000 - $5,579
197,538
kWh
$2,988
399
kW-months/year
$3,770
972
MMBtu
$340
473,200
Tgal
$1,120
-
lb
$980
-
Tgal
$1,971,000
-
%
TOTAL IMPLEMENTED Savings:
$9,887
Cost:
$31,300
$5,579 197,538 $2,988 399 - - $340 473,200 - - $980 - - - $5,579
197,538
kWh
$2,988
399
kW-months/year
-
-
MMBtu
$340
473,200
Tgal
-
-
lb
$980
-
Tgal
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ Tgal $ %
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Water Consumption Increase in Production Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Water Consumption Increase in Production