IAC logo
IAC Assessment: CO0394
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0394
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1997
Principal Product aerospace hardware
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 280
Plant Area (Sq.Ft.) 254,000
Annual Production 2,400,000 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $292,603 14,497,949 kWh $0.02
Electricity Demand $328,584 49,179 kW-months/year $6.68
Electricity Fees $1,995 - $ -
Natural Gas $95,604 28,639 MMBtu $3.34
TOTAL ENERGY COSTS $779,386
RECOMMENDED SAVINGS* $360,302 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ gal $ gal $ lb $ $ $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$382
Cost:
$687
$175 10,551 $207 30 - - - - - - - - - - - - $175
10,551
kWh
$207
30
kW-months/year
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,530
Cost:
$3,940
$700 42,497 $830 117 - - - - - - - - - - - - $700
42,497
kWh
$830
117
kW-months/year
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$8,760
Cost:
$10,000
- - - - $2,813 540 $2,917 560 - - $300 - $2,730 - - - -
-
kWh
-
-
kW-months/year
$2,813
540
gal
$2,917
560
gal
-
-
lb
$300
-
$
$2,730
-
$
-
-
$
04: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$6,360
Cost:
$22,200
- - - - - 13,040 - - - - - - $6,360 - - - -
-
kWh
-
-
kW-months/year
-
13,040
gal
-
-
gal
-
-
lb
-
-
$
$6,360
-
$
-
-
$
05: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$5,740
Cost:
$5,680
- - $(-120) (-20) - - $3,440 2,340 - - $(-4,400) - $6,820 - - - -
-
kWh
$(-120)
(-20)
kW-months/year
-
-
gal
$3,440
2,340
gal
-
-
lb
$(-4,400)
-
$
$6,820
-
$
-
-
$
06: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$6,000
Cost:
$23,500
$(-620) (-37,515) $1,050 (-180) - - - - $5,570 14,660 - - - - - - $(-620)
(-37,515)
kWh
$1,050
(-180)
kW-months/year
-
-
gal
-
-
gal
$5,570
14,660
lb
-
-
$
-
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,530
Cost:
-
- - - - - - - - $1,530 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
$1,530
-
lb
-
-
$
-
-
$
-
-
$
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$330,000
Cost:
-
- - - - - - - - - - $(-120,000) - - - $450,000 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
-
-
lb
$(-120,000)
-
$
-
-
$
$450,000
-
$
TOTAL RECOMMENDED Savings:
$360,302
Cost:
$66,007
$255 15,533 $1,967 (-53) $2,813 13,580 $6,357 2,900 $7,100 14,660 $(-124,100) - $15,910 - $450,000 - $255
15,533
kWh
$1,967
(-53)
kW-months/year
$2,813
13,580
gal
$6,357
2,900
gal
$7,100
14,660
lb
$(-124,100)
-
$
$15,910
-
$
$450,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost By-product Production