IAC Assessment: CO0399
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1997
Principal Product custom signs
NAICS n/a
SIC 3993 - Signs And Advertising Specialities
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 22,400
Annual Production 358 Pieces
Production Hrs. Annual 2,730
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $8,811 433,763 kWh $0.02
Electricity Demand $20,943 1,504 kW-months/year $13.92
Electricity Fees $151 - $ -
Natural Gas $9,316 2,934 MMBtu $3.18
TOTAL ENERGY COSTS $40,861
RECOMMENDED SAVINGS* $61,437 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,140
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$937
Cost:
$2,504
$213 12,016 $724 51 - - - - - - - - $213
12,016
kWh
$724
51
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,240
Cost:
$600
$330 18,464 $910 64 - - - - - - - - $330
18,464
kWh
$910
64
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$490
Cost:
$1,660
- - - - $490 124 - - - - - - -
-
kWh
-
-
kW-months/year
$490
124
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$320
Cost:
$750
- - - - $320 79 - - - - - - -
-
kWh
-
-
kW-months/year
$320
79
MMBtu
-
-
$
-
-
$
-
-
$
05: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$480
Cost:
-
- - - - - - - - $480 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$480
-
$
-
-
$
06: 4.624 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME Savings:
$45,100
Cost:
$13,100
- - - - - - $(-46,800) - - - $91,900 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-46,800)
-
$
-
-
$
$91,900
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$12,870
Cost:
$1,100
$(-70) (-3,810) $(-80) (-5) $20 4 - - - - $13,000 - $(-70)
(-3,810)
kWh
$(-80)
(-5)
kW-months/year
$20
4
MMBtu
-
-
$
-
-
$
$13,000
-
$
TOTAL RECOMMENDED Savings:
$61,437
Cost:
$19,714
$473 26,670 $1,554 110 $830 207 $(-46,800) - $480 - $104,900 - $473
26,670
kWh
$1,554
110
kW-months/year
$830
207
MMBtu
$(-46,800)
-
$
$480
-
$
$104,900
-
$
TOTAL IMPLEMENTED Savings:
$47,140
Cost:
$14,450
$330 18,464 $910 64 $320 79 $(-46,800) - $480 - $91,900 - $330
18,464
kWh
$910
64
kW-months/year
$320
79
MMBtu
$(-46,800)
-
$
$480
-
$
$91,900
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product