IAC logo
IAC Assessment: CO0400
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0400
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1997
Principal Product truck/trailer van bodies
NAICS n/a
SIC 3713 - Truck And Bus Bodies
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 39,000
Annual Production 1,050 Pieces
Production Hrs. Annual 2,600
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,534 799,531 kWh $0.02
Electricity Demand $37,689 2,651 kW-months/year $14.22
Electricity Fees $146 - $ -
Natural Gas $22,893 5,099 MMBtu $4.49
TOTAL ENERGY COSTS $79,632
RECOMMENDED SAVINGS* $43,262 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,242
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Primary Product
$ kWh $ kW-months/year $ lb $ lb $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,570
Cost:
$1,000
- - $4,570 322 - - - - - - -
-
kWh
$4,570
322
kW-months/year
-
-
lb
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,292
Cost:
$1,356
$288 15,826 $1,004 71 - - - - - - $288
15,826
kWh
$1,004
71
kW-months/year
-
-
lb
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,220
Cost:
$420
$270 14,654 $950 67 - - - - - - $270
14,654
kWh
$950
67
kW-months/year
-
-
lb
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$630
Cost:
-
- - - - $630 15,000 - - - - -
-
kWh
-
-
kW-months/year
$630
15,000
lb
-
-
lb
-
-
$
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$450
Cost:
-
- - - - - - $450 110 - - -
-
kWh
-
-
kW-months/year
-
-
lb
$450
110
lb
-
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$35,100
Cost:
$1,800
- - - - - - - - $35,100 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
$35,100
-
$
TOTAL RECOMMENDED Savings:
$43,262
Cost:
$4,576
$558 30,480 $6,524 460 $630 15,000 $450 110 $35,100 - $558
30,480
kWh
$6,524
460
kW-months/year
$630
15,000
lb
$450
110
lb
$35,100
-
$
TOTAL IMPLEMENTED Savings:
$38,242
Cost:
$3,576
$558 30,480 $1,954 138 $630 15,000 - - $35,100 - $558
30,480
kWh
$1,954
138
kW-months/year
$630
15,000
lb
-
-
lb
$35,100
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Primary Product