Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1997 |
Principal Product | truck/trailer van bodies |
NAICS | n/a |
SIC | 3713 - Truck And Bus Bodies |
Sales | $10,000,000-$50,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 39,000 |
Annual Production | 1,050 Pieces |
Production Hrs. Annual | 2,600 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $14,534 | 799,531 | kWh | $0.02 |
Electricity Demand | $37,689 | 2,651 | kW-months/year | $14.22 |
Electricity Fees | $146 | - | $ | - |
Natural Gas | $22,893 | 5,099 | MMBtu | $4.49 |
TOTAL ENERGY COSTS | $79,632 | |||
RECOMMENDED SAVINGS* | $43,262 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,242 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Solid Waste (haz) | Primary Product | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Solid Waste (haz) | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $4,570 Cost: $1,000 |
- | - | $4,570 | 322 | - | - | - | - | - | - |
- - kWh |
$4,570 322 kW-months/year |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,292 Cost: $1,356 |
$288 | 15,826 | $1,004 | 71 | - | - | - | - | - | - |
$288 15,826 kWh |
$1,004 71 kW-months/year |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,220 Cost: $420 |
$270 | 14,654 | $950 | 67 | - | - | - | - | - | - |
$270 14,654 kWh |
$950 67 kW-months/year |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $630 Cost: - |
- | - | - | - | $630 | 15,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
$630 15,000 lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $450 Cost: - |
- | - | - | - | - | - | $450 | 110 | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$450 110 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $35,100 Cost: $1,800 |
- | - | - | - | - | - | - | - | $35,100 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - lb |
$35,100 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $43,262 Cost: $4,576 |
$558 | 30,480 | $6,524 | 460 | $630 | 15,000 | $450 | 110 | $35,100 | - | $558 30,480 kWh |
$6,524 460 kW-months/year |
$630 15,000 lb |
$450 110 lb |
$35,100 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,242 Cost: $3,576 |
$558 | 30,480 | $1,954 | 138 | $630 | 15,000 | - | - | $35,100 | - | $558 30,480 kWh |
$1,954 138 kW-months/year |
$630 15,000 lb |
- - lb |
$35,100 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Solid Waste (haz) | Primary Product | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Solid Waste (haz) | Primary Product |