IAC logo
IAC Assessment: CO0404
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0404
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1997
Principal Product animal feeds
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $5,000,000-$10,000,000
# of Employees 23
Plant Area (Sq.Ft.) 42,150
Annual Production 60,000 Tons
Production Hrs. Annual 3,248
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,768 1,017,878 kWh $0.03
Electricity Demand $52,441 6,113 kW-months/year $8.58
Electricity Fees $132 - $ -
Natural Gas $37,242 10,688 MMBtu $3.48
TOTAL ENERGY COSTS $119,813
RECOMMENDED SAVINGS* $9,995 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,995
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Electricity Usage Electricity Demand Solid Waste (haz)
$ kWh $ kW-months/year $ lb
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,800
Cost:
$5,000
- - $7,800 671 - - -
-
kWh
$7,800
671
kW-months/year
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,420
Cost:
$280
$640 22,860 $780 91 - - $640
22,860
kWh
$780
91
kW-months/year
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$365
Cost:
$498
$163 5,862 $202 23 - - $163
5,862
kWh
$202
23
kW-months/year
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$210
Cost:
$440
$100 3,517 $110 13 - - $100
3,517
kWh
$110
13
kW-months/year
-
-
lb
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$200
Cost:
-
- - - - $200 20 -
-
kWh
-
-
kW-months/year
$200
20
lb
TOTAL RECOMMENDED Savings:
$9,995
Cost:
$6,218
$903 32,239 $8,892 798 $200 20 $903
32,239
kWh
$8,892
798
kW-months/year
$200
20
lb
TOTAL IMPLEMENTED Savings:
$9,995
Cost:
$6,218
$903 32,239 $8,892 798 $200 20 $903
32,239
kWh
$8,892
798
kW-months/year
$200
20
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (haz) Electricity Usage Electricity Demand Solid Waste (haz)