IAC Assessment: CO0406
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0406
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product window units and tempered glass
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 53,000
Annual Production 2,900,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,717 1,624,560 kWh $0.02
Electricity Demand $109,486 8,711 kW-months/year $12.57
Electricity Fees $1,208 - $ -
Natural Gas $7,375 1,846 MMBtu $4.00
Other Energy $6,010 221 MMBtu $27.19
TOTAL ENERGY COSTS $182,716
RECOMMENDED SAVINGS* $45,950 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,570
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Other Energy Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $ $ $
01: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$5,100
Cost:
$1,550
- - - - $(-910) (-221) $6,010 221 - - - - - - -
-
kWh
-
-
kW-months/year
$(-910)
(-221)
MMBtu
$6,010
221
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,380
Cost:
$25,000
$4,380 231,536 - - - - - - - - - - - - $4,380
231,536
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$1,470
Cost:
$500
- - $(-560) (-38) - - - - $2,000 - $30 - - - -
-
kWh
$(-560)
(-38)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$2,000
-
$
$30
-
$
-
-
$
04: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$35,000
Cost:
$9,390
- - - - - - - - - - - - $35,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
$35,000
-
$
TOTAL RECOMMENDED Savings:
$45,950
Cost:
$36,440
$4,380 231,536 $(-560) (-38) $(-910) (-221) $6,010 221 $2,000 - $30 - $35,000 - $4,380
231,536
kWh
$(-560)
(-38)
kW-months/year
$(-910)
(-221)
MMBtu
$6,010
221
MMBtu
$2,000
-
$
$30
-
$
$35,000
-
$
TOTAL IMPLEMENTED Savings:
$6,570
Cost:
$2,050
- - $(-560) (-38) $(-910) (-221) $6,010 221 $2,000 - $30 - - - -
-
kWh
$(-560)
(-38)
kW-months/year
$(-910)
(-221)
MMBtu
$6,010
221
MMBtu
$2,000
-
$
$30
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Energy Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Other Energy Personnel Changes Ancillary Material Cost Primary Product