Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product wood moldings
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 108
Plant Area (Sq.Ft.) 127,758
Annual Production 5,000 Thousand Feet
Production Hrs. Annual 4,368
Location (State) WY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,959 2,880,715 kWh $0.03
Electricity Demand $32,664 10,299 kW-months/year $3.17
Electricity Fees $16,802 - $ -
Natural Gas $15,152 3,380 MMBtu $4.48
TOTAL ENERGY COSTS $146,577
RECOMMENDED SAVINGS* $15,886 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,200
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Increase in Production Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Increase in Production
$ kWh $ kW-months/year $ lb $ $ $ %
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$136
Cost:
$598
$110 4,103 $26 8 - - - - - - $110
4,103
kWh
$26
8
kW-months/year
-
-
lb
-
-
$
-
-
%
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$330
Cost:
$480
$250 9,379 $80 26 - - - - - - $250
9,379
kWh
$80
26
kW-months/year
-
-
lb
-
-
$
-
-
%
03: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$220
Cost:
-
- - - - $220 30 - - - - -
-
kWh
-
-
kW-months/year
$220
30
lb
-
-
$
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,500
Cost:
$23,420
- - - - - - - - $13,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$13,500
-
%
05: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$1,700
Cost:
$1,500
- - - - - - $1,700 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,700
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$15,886
Cost:
$25,998
$360 13,482 $106 34 $220 30 $1,700 - $13,500 - $360
13,482
kWh
$106
34
kW-months/year
$220
30
lb
$1,700
-
$
$13,500
-
%
TOTAL IMPLEMENTED Savings:
$15,200
Cost:
$24,920
- - - - - - $1,700 - $13,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,700
-
$
$13,500
-
%
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ %
Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Increase in Production Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Increase in Production