IAC logo
IAC Assessment: CO0411
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0411
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product asphalt shingles
NAICS n/a
SIC 2952 - Asphalt Felts And Coatings
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 180,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,460 2,882,181 kWh $0.02
Electricity Demand $86,397 6,379 kW-months/year $13.54
Electricity Fees $3,576 - $ -
Natural Gas $106,709 41,042 MMBtu $2.60
TOTAL ENERGY COSTS $418,468
RECOMMENDED SAVINGS* $352,303 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $274,393
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$290
Cost:
$523
$107 6,155 $183 14 - - - - - - - - - - - - $107
6,155
kWh
$183
14
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,480
Cost:
$100
$590 34,291 $890 66 - - - - - - - - - - - - $590
34,291
kWh
$890
66
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$460
Cost:
$660
$180 10,551 $280 21 - - - - - - - - - - - - $180
10,551
kWh
$280
21
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$102,860
Cost:
$72,000
- - - - $(-740) (-291) - - $12,600 1,099,000 - - $91,000 - - - -
-
kWh
-
-
kW-months/year
$(-740)
(-291)
MMBtu
-
-
Tgal
$12,600
1,099,000
lb
-
-
$
$91,000
-
$
-
-
Tgal
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$68,610
Cost:
$200,000
$(-8,730) (-503,810) $(-13,100) (-969) - - - - $90,440 7,696,000 - - - - - - $(-8,730)
(-503,810)
kWh
$(-13,100)
(-969)
kW-months/year
-
-
MMBtu
-
-
Tgal
$90,440
7,696,000
lb
-
-
$
-
-
$
-
-
Tgal
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$26,243
Cost:
$21,600
$(-750) (-43,376) $(-1,120) (-83) - - $12,347 7,883,200 - - - - - - $15,766 - $(-750)
(-43,376)
kWh
$(-1,120)
(-83)
kW-months/year
-
-
MMBtu
$12,347
7,883,200
Tgal
-
-
lb
-
-
$
-
-
$
$15,766
-
Tgal
07: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$8,840
Cost:
$45,000
- - - - - - - - $8,840 2,886,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$8,840
2,886,000
lb
-
-
$
-
-
$
-
-
Tgal
08: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$143,520
Cost:
$17,500
- - - - - - - - - - $143,520 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$143,520
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$352,303
Cost:
$357,383
$(-8,603) (-496,189) $(-12,867) (-951) $(-740) (-291) $12,347 7,883,200 $111,880 11,681,000 $143,520 - $91,000 - $15,766 - $(-8,603)
(-496,189)
kWh
$(-12,867)
(-951)
kW-months/year
$(-740)
(-291)
MMBtu
$12,347
7,883,200
Tgal
$111,880
11,681,000
lb
$143,520
-
$
$91,000
-
$
$15,766
-
Tgal
TOTAL IMPLEMENTED Savings:
$274,393
Cost:
$111,723
$(-53) (-2,930) $(-47) (-3) $(-740) (-291) $12,347 7,883,200 $12,600 1,099,000 $143,520 - $91,000 - $15,766 - $(-53)
(-2,930)
kWh
$(-47)
(-3)
kW-months/year
$(-740)
(-291)
MMBtu
$12,347
7,883,200
Tgal
$12,600
1,099,000
lb
$143,520
-
$
$91,000
-
$
$15,766
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption