IAC logo
IAC Assessment: CO0413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product metal building components
NAICS n/a
SIC 3448 - Prefabricated Metal Buildings
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 106,800
Annual Production 21,000,000 Pounds
Production Hrs. Annual 3,250
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,076 1,003,224 kWh $0.03
Electricity Demand $26,889 2,731 kW-months/year $9.85
Electricity Fees $132 - $ -
Natural Gas $12,717 2,394 MMBtu $5.31
TOTAL ENERGY COSTS $70,604
RECOMMENDED SAVINGS* $53,737 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Primary Product
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$382
Cost:
$650
$167 5,275 $215 22 - - - - - - $167
5,275
kWh
$215
22
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$500
Cost:
$270
$250 7,620 $250 25 - - - - - - $250
7,620
kWh
$250
25
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$65
Cost:
$233
$24 879 $41 4 - - - - - - $24
879
kWh
$41
4
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$260
Cost:
-
- - - - $260 40 - - - - -
-
kWh
-
-
kW-months/year
$260
40
lb
-
-
$
-
-
$
05: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$48,200
Cost:
-
- - - - - - $(-29,200) - $77,400 - -
-
kWh
-
-
kW-months/year
-
-
lb
$(-29,200)
-
$
$77,400
-
$
06: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$3,020
Cost:
-
- - - - - - $3,020 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$3,020
-
$
-
-
$
07: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$1,310
Cost:
-
- - - - - - $1,310 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,310
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$53,737
Cost:
$1,153
$441 13,774 $506 51 $260 40 $(-24,870) - $77,400 - $441
13,774
kWh
$506
51
kW-months/year
$260
40
lb
$(-24,870)
-
$
$77,400
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Primary Product