IAC logo
IAC Assessment: CO0414
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0414
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product Christian books, magazines, videos, and curriculm
NAICS n/a
SIC 2731 - Book Publishing
Sales $10,000,000-$50,000,000
# of Employees 205
Plant Area (Sq.Ft.) 75,591
Annual Production 266,400 Pieces
Production Hrs. Annual 2,340
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,559 1,115,475 kWh $0.04
Electricity Demand $20,064 2,376 kW-months/year $8.44
Electricity Fees $714 - $ -
Natural Gas $12,557 2,877 MMBtu $4.36
TOTAL ENERGY COSTS $90,069
RECOMMENDED SAVINGS* $104,380 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $99,190
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ lb $ lb $ $ $ $ $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,630
Cost:
$8,000
- - $2,630 310 - - - - - - - - - - - - -
-
kWh
$2,630
310
kW-months/year
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,660
Cost:
$2,070
$830 24,912 $830 98 - - - - - - - - - - - - $830
24,912
kWh
$830
98
kW-months/year
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
03: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$670
Cost:
-
- - - - - - $670 186 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$670
186
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$120
Cost:
-
- - - - $120 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$120
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$88,140
Cost:
$7,100
- - - - - - - - $18,410 - $35,000 - $(-52,000) - $86,730 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
$18,410
-
$
$35,000
-
$
$(-52,000)
-
$
$86,730
-
$
06: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$6,760
Cost:
$12,680
- - - - - - - - $6,760 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
$6,760
-
$
-
-
$
-
-
$
-
-
$
07: 4.323 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS Savings:
$1,840
Cost:
$4,260
- - - - - - - - $1,840 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
$1,840
-
$
-
-
$
-
-
$
-
-
$
08: 4.221 USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY Savings:
$2,560
Cost:
$300
- - - - - - - - - - - - $2,560 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
-
-
$
-
-
$
$2,560
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$104,380
Cost:
$34,410
$830 24,912 $3,460 408 $120 - $670 186 $27,010 - $35,000 - $(-49,440) - $86,730 - $830
24,912
kWh
$3,460
408
kW-months/year
$120
-
lb
$670
186
lb
$27,010
-
$
$35,000
-
$
$(-49,440)
-
$
$86,730
-
$
TOTAL IMPLEMENTED Savings:
$99,190
Cost:
$26,110
$830 24,912 $830 98 $120 - $670 186 $27,010 - $35,000 - $(-52,000) - $86,730 - $830
24,912
kWh
$830
98
kW-months/year
$120
-
lb
$670
186
lb
$27,010
-
$
$35,000
-
$
$(-52,000)
-
$
$86,730
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product