IAC logo
IAC Assessment: CO0421
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0421
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product commercial printing
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 40,000
Annual Production 34,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,812 1,065,944 kWh $0.02
Electricity Demand $39,631 2,742 kW-months/year $14.45
Electricity Fees $216 - $ -
Natural Gas $11,285 2,365 MMBtu $4.77
TOTAL ENERGY COSTS $80,019
RECOMMENDED SAVINGS* $55,600 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ gal $ lb $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,932
Cost:
$6,811
$710 37,515 $1,222 84 - - - - - - - - - - $710
37,515
kWh
$1,222
84
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$910
Cost:
$2,500
- - $910 63 - - - - - - - - - - -
-
kWh
$910
63
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
03: 3.8133 CONVERT TO AQUEOUS CLEANING Savings:
$11,718
Cost:
$1,500
- - $60 4 - - $7,548 - - - $4,110 - - - -
-
kWh
$60
4
kW-months/year
-
-
gal
$7,548
-
lb
-
-
lb
$4,110
-
$
-
-
$
04: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$2,040
Cost:
-
- - - - $700 275 - - - - $1,340 - - - -
-
kWh
-
-
kW-months/year
$700
275
gal
-
-
lb
-
-
lb
$1,340
-
$
-
-
$
05: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$1,380
Cost:
-
- - - - - - - - $1,380 387 - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$1,380
387
lb
-
-
$
-
-
$
06: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$37,620
Cost:
$15,460
- - - - - - - - - - - - $37,620 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
$37,620
-
$
TOTAL RECOMMENDED Savings:
$55,600
Cost:
$26,271
$710 37,515 $2,192 151 $700 275 $7,548 - $1,380 387 $5,450 - $37,620 - $710
37,515
kWh
$2,192
151
kW-months/year
$700
275
gal
$7,548
-
lb
$1,380
387
lb
$5,450
-
$
$37,620
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ lb $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Ancillary Material Cost Primary Product