IAC logo
IAC Assessment: CO0422
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0422
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product pharmaceuticals
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $1,000,000-$5,000,000
# of Employees 130
Plant Area (Sq.Ft.) 51,200
Annual Production 200,000 Pieces
Production Hrs. Annual 2,600
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,193 1,466,882 kWh $0.03
Electricity Demand $31,980 4,132 kW-months/year $7.74
Electricity Fees $1,246 - $ -
Natural Gas $11,499 2,385 MMBtu $4.82
TOTAL ENERGY COSTS $102,549
RECOMMENDED SAVINGS* $177,104 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $175,840
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Product
$ kWh $ kW-months/year $ lb $ lb $ $ $ $
01: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$5,830
Cost:
-
- - - - - - - - $5,830 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
$5,830
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$404
Cost:
$1,292
$78 4,689 $326 37 - - - - - - - - $78
4,689
kWh
$326
37
kW-months/year
-
-
lb
-
-
lb
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$880
Cost:
$2,000
- - $880 78 - - - - - - - - -
-
kWh
$880
78
kW-months/year
-
-
lb
-
-
lb
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$560
Cost:
-
$240 14,361 $320 40 - - - - - - - - $240
14,361
kWh
$320
40
kW-months/year
-
-
lb
-
-
lb
-
-
$
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$430
Cost:
-
- - - - $430 - - - - - - - -
-
kWh
-
-
kW-months/year
$430
-
lb
-
-
lb
-
-
$
-
-
$
06: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$430
Cost:
-
- - - - $430 - - - - - - - -
-
kWh
-
-
kW-months/year
$430
-
lb
-
-
lb
-
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$400
Cost:
$130
- - - - - - $400 44 - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$400
44
lb
-
-
$
-
-
$
08: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$158,670
Cost:
$50,000
- - - - - - - - - - $158,670 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
-
-
$
$158,670
-
$
09: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$9,500
Cost:
-
- - - - - - - - - - $9,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
-
-
$
$9,500
-
$
TOTAL RECOMMENDED Savings:
$177,104
Cost:
$53,422
$318 19,050 $1,526 155 $860 - $400 44 $5,830 - $168,170 - $318
19,050
kWh
$1,526
155
kW-months/year
$860
-
lb
$400
44
lb
$5,830
-
$
$168,170
-
$
TOTAL IMPLEMENTED Savings:
$175,840
Cost:
$52,130
$240 14,361 $1,200 118 - - $400 44 $5,830 - $168,170 - $240
14,361
kWh
$1,200
118
kW-months/year
-
-
lb
$400
44
lb
$5,830
-
$
$168,170
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Product