Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1999 |
Principal Product | thermoformed plastic components |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 11 |
Plant Area (Sq.Ft.) | 19,000 |
Annual Production | 8,790,000 Pieces |
Production Hrs. Annual | 2,184 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $9,542 | 538,394 | kWh | $0.02 |
Electricity Demand | $44,585 | 3,270 | kW-months/year | $13.63 |
Electricity Fees | $204 | - | $ | - |
Natural Gas | $5,757 | 1,049 | MMBtu | $5.49 |
TOTAL ENERGY COSTS | $60,952 | |||
RECOMMENDED SAVINGS* | $77,061 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $1,630 Cost: $1,400 |
- | - | $1,630 | 120 | - | - | - | - | - | - | - | - |
- - kWh |
$1,630 120 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,250 Cost: $600 |
- | - | - | - | $1,250 | 240 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,250 240 MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $441 Cost: $1,208 |
$98 | 5,569 | $343 | 25 | - | - | - | - | - | - | - | - |
$98 5,569 kWh |
$343 25 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $960 Cost: - |
$960 | 53,927 | - | - | - | - | - | - | - | - | - | - |
$960 53,927 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $460 Cost: $420 |
$90 | 4,982 | $370 | 27 | - | - | - | - | - | - | - | - |
$90 4,982 kWh |
$370 27 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $340 Cost: - |
- | - | - | - | - | - | $340 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$340 - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $220 Cost: $20 |
- | - | - | - | - | - | - | - | $220 | 28 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$220 28 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $71,760 Cost: $60,000 |
- | - | - | - | - | - | - | - | - | - | $71,760 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
$71,760 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $77,061 Cost: $63,648 |
$1,148 | 64,478 | $2,343 | 172 | $1,250 | 240 | $340 | - | $220 | 28 | $71,760 | - | $1,148 64,478 kWh |
$2,343 172 kW-months/year |
$1,250 240 MMBtu |
$340 - lb |
$220 28 lb |
$71,760 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes |