IAC Assessment: CO0440
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0440
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product metal injected molded parts
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 123,000
Annual Production 16,500,000 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $190,838 9,467,761 kWh $0.02
Electricity Demand $342,346 53,882 kW-months/year $6.35
Electricity Fees $1,892 - $ -
Natural Gas $23,201 4,699 MMBtu $4.94
TOTAL ENERGY COSTS $564,277
RECOMMENDED SAVINGS* $47,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,170
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$15,290
Cost:
$500
- - - - - - $15,290 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$15,290
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,160
Cost:
$500
$1,200 63,599 $1,740 87 $(-780) - - - - - - - $1,200
63,599
kWh
$1,740
87
kW-months/year
$(-780)
-
$
-
-
$
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$640
Cost:
-
- - $640 123 - - - - - - - - -
-
kWh
$640
123
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
04: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$9,880
Cost:
$1,000
- - - - - - $(-2,000) - $11,880 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$(-2,000)
-
$
$11,880
-
$
-
-
$
05: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$20,000
Cost:
-
- - - - - - $(-2,000) - - - $22,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$(-2,000)
-
$
-
-
$
$22,000
-
$
TOTAL RECOMMENDED Savings:
$47,970
Cost:
$2,000
$1,200 63,599 $2,380 210 $(-780) - $11,290 - $11,880 - $22,000 - $1,200
63,599
kWh
$2,380
210
kW-months/year
$(-780)
-
$
$11,290
-
$
$11,880
-
$
$22,000
-
$
TOTAL IMPLEMENTED Savings:
$45,170
Cost:
$1,500
- - - - - - $11,290 - $11,880 - $22,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$11,290
-
$
$11,880
-
$
$22,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Raw Material Primary Product