IAC logo
IAC Assessment: CO0441
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0441
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product precision sheet metal products
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 132
Plant Area (Sq.Ft.) 37,000
Annual Production 608,000 Pieces
Production Hrs. Annual 6,942
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,385 985,346 kWh $0.02
Electricity Demand $31,100 2,246 kW-months/year $13.85
Electricity Fees $900 - $ -
Natural Gas $8,455 1,779 MMBtu $4.75
TOTAL ENERGY COSTS $69,630
RECOMMENDED SAVINGS* $397,526 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $391,180
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Solid Waste (haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Solid Waste (haz) Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ gal $ lb $ lb $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,470
Cost:
$2,000
- - $2,470 180 - - - - - - - - - - -
-
kWh
$2,470
180
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,366
Cost:
$6,988
$619 27,257 $747 59 - - - - - - - - - - $619
27,257
kWh
$747
59
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,490
Cost:
$1,160
$640 35,756 $850 62 - - - - - - - - - - $640
35,756
kWh
$850
62
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,970
Cost:
$200
$1,200 41,325 $770 56 - - - - - - - - - - $1,200
41,325
kWh
$770
56
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$710
Cost:
-
- - - - - - $710 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$710
-
lb
-
-
lb
-
-
$
-
-
$
06: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$590
Cost:
$1,090
- - - - $720 - - - - - $(-130) - - - -
-
kWh
-
-
kW-months/year
$720
-
gal
-
-
lb
-
-
lb
$(-130)
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$430
Cost:
-
- - - - - - - - $550 178 $(-120) - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$550
178
lb
$(-120)
-
$
-
-
$
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$360,000
Cost:
$375,000
- - - - - - - - - - - - $360,000 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
$360,000
-
$
09: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$28,500
Cost:
-
- - - - - - - - - - - - $28,500 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
$28,500
-
$
TOTAL RECOMMENDED Savings:
$397,526
Cost:
$386,438
$2,459 104,338 $4,837 357 $720 - $710 - $550 178 $(-250) - $388,500 - $2,459
104,338
kWh
$4,837
357
kW-months/year
$720
-
gal
$710
-
lb
$550
178
lb
$(-250)
-
$
$388,500
-
$
TOTAL IMPLEMENTED Savings:
$391,180
Cost:
$375,200
$1,200 41,325 $770 56 - - $710 - - - - - $388,500 - $1,200
41,325
kWh
$770
56
kW-months/year
-
-
gal
$710
-
lb
-
-
lb
-
-
$
$388,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ lb $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Solid Waste (haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Solid Waste (haz) Ancillary Material Cost Primary Product