IAC logo
IAC Assessment: CO0448
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0448
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product corrugated containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 121,000
Annual Production 120,000,000 Thousand Feet
Production Hrs. Annual 4,420
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,501 694,021 kWh $0.02
Electricity Demand $47,672 3,460 kW-months/year $13.78
Electricity Fees $516 - $ -
Natural Gas $10,288 2,256 MMBtu $4.56
TOTAL ENERGY COSTS $73,479
RECOMMENDED SAVINGS* $203,110 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,820
Cost:
$4,000
- - $4,820 348 - - - - - - - - -
-
kWh
$4,820
348
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$830
Cost:
$1,080
- - - - $830 187 - - - - - - -
-
kWh
-
-
kW-months/year
$830
187
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$430
Cost:
$30
$430 6,155 - - - - - - - - - - $430
6,155
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$380
Cost:
$150
$80 4,103 - - $300 68 - - - - - - $80
4,103
kWh
-
-
kW-months/year
$300
68
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$330
Cost:
$210
$1,110 42,790 - - - - $(-780) - - - - - $1,110
42,790
kWh
-
-
kW-months/year
-
-
MMBtu
$(-780)
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20
Cost:
-
$100 5,569 $200 15 - - $(-40) - $(-240) - - - $100
5,569
kWh
$200
15
kW-months/year
-
-
MMBtu
$(-40)
-
$
$(-240)
-
$
-
-
$
07: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$160,300
Cost:
$489,000
- - - - - - - - - - $160,300 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$160,300
-
$
08: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$36,000
Cost:
-
- - - - - - - - - - $36,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$36,000
-
$
TOTAL RECOMMENDED Savings:
$203,110
Cost:
$494,470
$1,720 58,617 $5,020 363 $1,130 255 $(-820) - $(-240) - $196,300 - $1,720
58,617
kWh
$5,020
363
kW-months/year
$1,130
255
MMBtu
$(-820)
-
$
$(-240)
-
$
$196,300
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product