Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product ice cream
NAICS n/a
SIC 2024 - Ice Cream And Frozen Desserts
Sales $1,000,000-$5,000,000
# of Employees 38
Plant Area (Sq.Ft.) 48,000
Annual Production 5,100,000 Thousand Gallons
Production Hrs. Annual 4,680
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $235,078 5,444,900 kWh $0.04
Electricity Demand $74,159 12,000 kW-months/year $6.18
Electricity Fees $74,159 - $ -
Natural Gas $21,350 5,999 MMBtu $3.56
TOTAL ENERGY COSTS $430,548
RECOMMENDED SAVINGS* $17,112 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,452
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ Tgal
01: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$8,180
Cost:
-
- - $3,460 300 $4,720 - - - - - - - - - -
-
kWh
$3,460
300
kW-months/year
$4,720
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,460
Cost:
$7,500
- - $3,460 300 - - - - - - - - - - -
-
kWh
$3,460
300
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,630
Cost:
$80
$1,380 34,877 $1,030 90 - - - - $(-780) - - - - - $1,380
34,877
kWh
$1,030
90
kW-months/year
-
-
$
-
-
MMBtu
$(-780)
-
$
-
-
$
-
-
Tgal
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,010
Cost:
-
$510 10,258 $500 44 - - - - - - - - - - $510
10,258
kWh
$500
44
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$610
Cost:
$30
$350 8,792 $260 23 - - - - - - - - - - $350
8,792
kWh
$260
23
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$392
Cost:
-
$683 17,292 $291 25 - - - - - - $(-582) - - - $683
17,292
kWh
$291
25
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$(-582)
-
$
-
-
Tgal
07: 3.4151 MINIMIZE WATER USAGE Savings:
$1,480
Cost:
$640
- - - - - - $680 191 - - - - $800 - -
-
kWh
-
-
kW-months/year
-
-
$
$680
191
MMBtu
-
-
$
-
-
$
$800
-
Tgal
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$350
Cost:
$490
- - - - - - $160 45 - - - - $190 - -
-
kWh
-
-
kW-months/year
-
-
$
$160
45
MMBtu
-
-
$
-
-
$
$190
-
Tgal
TOTAL RECOMMENDED Savings:
$17,112
Cost:
$8,740
$2,923 71,219 $9,001 782 $4,720 - $840 236 $(-780) - $(-582) - $990 - $2,923
71,219
kWh
$9,001
782
kW-months/year
$4,720
-
$
$840
236
MMBtu
$(-780)
-
$
$(-582)
-
$
$990
-
Tgal
TOTAL IMPLEMENTED Savings:
$7,452
Cost:
$8,100
$2,923 71,219 $5,541 482 - - $160 45 $(-780) - $(-582) - $190 - $2,923
71,219
kWh
$5,541
482
kW-months/year
-
-
$
$160
45
MMBtu
$(-780)
-
$
$(-582)
-
$
$190
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Water Consumption