IAC logo
IAC Assessment: CO0455
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0455
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product particleboard
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 140,000
Annual Production 48,000,000 Thousand Feet
Production Hrs. Annual 8,712
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $721,833 16,961,020 kWh $0.04
Electricity Demand $311,769 31,224 kW-months/year $9.98
Electricity Fees $74,159 - $ -
Natural Gas $198,909 58,141 MMBtu $3.42
TOTAL ENERGY COSTS $1,387,635
RECOMMENDED SAVINGS* $130,400 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ Tgal $ gal $ lb $ $ $ $ $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$41,240
Cost:
$10,000
- - $41,240 3,579 - - - - - - - - - - - - - - -
-
kWh
$41,240
3,579
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,020
Cost:
$220
$4,690 118,992 $1,890 164 - - - - - - $(-1,560) - - - - - - - $4,690
118,992
kWh
$1,890
164
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
$(-1,560)
-
$
-
-
$
-
-
$
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$2,640
Cost:
-
$1,400 27,843 $1,240 107 - - - - - - - - - - - - - - $1,400
27,843
kWh
$1,240
107
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$430
Cost:
$440
$310 7,913 $120 11 - - - - - - - - - - - - - - $310
7,913
kWh
$120
11
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$39,330
Cost:
-
- - - - $(-70) (-26,020) $38,440 6,506 - - - - - - $960 - - - -
-
kWh
-
-
kW-months/year
$(-70)
(-26,020)
Tgal
$38,440
6,506
gal
-
-
lb
-
-
$
-
-
$
$960
-
$
-
-
$
06: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$2,180
Cost:
$3,500
- - - - - - - - $280 75,800 - - $1,900 - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
$280
75,800
lb
-
-
$
$1,900
-
$
-
-
$
-
-
$
07: 4.624 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME Savings:
$39,560
Cost:
$1,000
- - - - - - - - - - $(-40,000) - - - - - $79,560 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
$(-40,000)
-
$
-
-
$
-
-
$
$79,560
-
$
TOTAL RECOMMENDED Savings:
$130,400
Cost:
$15,160
$6,400 154,748 $44,490 3,861 $(-70) (-26,020) $38,440 6,506 $280 75,800 $(-41,560) - $1,900 - $960 - $79,560 - $6,400
154,748
kWh
$44,490
3,861
kW-months/year
$(-70)
(-26,020)
Tgal
$38,440
6,506
gal
$280
75,800
lb
$(-41,560)
-
$
$1,900
-
$
$960
-
$
$79,560
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ gal $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product