IAC logo
IAC Assessment: CO0458
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0458
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2000
Principal Product sealants, coatings, and adhesives
NAICS n/a
SIC 2891 - Adhesives And Sealants
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 150,000
Annual Production 18,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,149 3,497,069 kWh $0.03
Electricity Demand $65,913 8,681 kW-months/year $7.59
Electricity Fees $4,413 - $ -
Natural Gas $52,511 12,306 MMBtu $4.27
TOTAL ENERGY COSTS $243,986
RECOMMENDED SAVINGS* $25,310 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,730
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,320
Cost:
$10,000
- - $5,320 716 - - - - - - - - -
-
kWh
$5,320
716
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,970
Cost:
$2,320
$650 23,154 $1,320 178 - - - - - - - - $650
23,154
kWh
$1,320
178
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,300
Cost:
$1,700
- - - - $1,300 287 - - - - - - -
-
kWh
-
-
kW-months/year
$1,300
287
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,000
Cost:
$2,360
- - - - $1,000 221 - - - - - - -
-
kWh
-
-
kW-months/year
$1,000
221
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$450
Cost:
$270
$810 29,015 $420 56 - - - - $(-780) - - - $810
29,015
kWh
$420
56
kW-months/year
-
-
MMBtu
-
-
lb
$(-780)
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10
Cost:
-
$310 10,844 $190 25 - - - - $(-150) - $(-340) - $310
10,844
kWh
$190
25
kW-months/year
-
-
MMBtu
-
-
lb
$(-150)
-
$
$(-340)
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$120
Cost:
-
- - - - - - $130 46 - - $(-10) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$130
46
lb
-
-
$
$(-10)
-
$
08: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$9,860
Cost:
$500
- - - - $9,860 - - - - - - - -
-
kWh
-
-
kW-months/year
$9,860
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$5,280
Cost:
$6,720
$50 1,758 $30 4 - - - - $360 - $4,840 - $50
1,758
kWh
$30
4
kW-months/year
-
-
MMBtu
-
-
lb
$360
-
$
$4,840
-
$
TOTAL RECOMMENDED Savings:
$25,310
Cost:
$23,870
$1,820 64,771 $7,280 979 $12,160 508 $130 46 $(-570) - $4,490 - $1,820
64,771
kWh
$7,280
979
kW-months/year
$12,160
508
MMBtu
$130
46
lb
$(-570)
-
$
$4,490
-
$
TOTAL IMPLEMENTED Savings:
$6,730
Cost:
$9,350
$860 30,773 $450 60 $1,000 221 - - $(-420) - $4,840 - $860
30,773
kWh
$450
60
kW-months/year
$1,000
221
MMBtu
-
-
lb
$(-420)
-
$
$4,840
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost