Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2000 |
Principal Product | custom architectural woodwork |
NAICS | n/a |
SIC | 2431 - Millwork |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 45,120 |
Annual Production | 40 Pieces |
Production Hrs. Annual | 2,860 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $16,768 | 1,021,102 | kWh | $0.02 |
Electricity Demand | $39,010 | 2,400 | kW-months/year | $16.25 |
Electricity Fees | $492 | - | $ | - |
Natural Gas | $9,068 | 1,967 | MMBtu | $4.61 |
TOTAL ENERGY COSTS | $85,416 | |||
RECOMMENDED SAVINGS* | $8,900 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $3,900 Cost: $2,500 |
- | - | $3,900 | 543 | - | - | - | - | - | - | - | - |
- - kWh |
$3,900 543 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,130 Cost: $2,250 |
- | - | - | - | $2,130 | 449 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,130 449 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,000 Cost: $390 |
$480 | 29,308 | $1,520 | 217 | - | - | - | - | - | - | - | - |
$480 29,308 kWh |
$1,520 217 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $520 Cost: $750 |
$70 | 4,103 | - | - | $450 | 94 | - | - | - | - | - | - |
$70 4,103 kWh |
- - kW-months/year |
$450 94 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $20 Cost: - |
$90 | 5,569 | $260 | 38 | - | - | - | - | $(-110) | - | $(-220) | - |
$90 5,569 kWh |
$260 38 kW-months/year |
- - MMBtu |
- - lb |
$(-110) - $ |
$(-220) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6125 SELL COMBUSTIBLE WASTE |
Savings: $330 Cost: - |
- | - | - | - | - | - | $330 | 20,200 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$330 20,200 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $8,900 Cost: $5,890 |
$640 | 38,980 | $5,680 | 798 | $2,580 | 543 | $330 | 20,200 | $(-110) | - | $(-220) | - | $640 38,980 kWh |
$5,680 798 kW-months/year |
$2,580 543 MMBtu |
$330 20,200 lb |
$(-110) - $ |
$(-220) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |