IAC logo
IAC Assessment: CO0461
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0461
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2000
Principal Product custom architectural woodwork
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 45,120
Annual Production 40 Pieces
Production Hrs. Annual 2,860
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,768 1,021,102 kWh $0.02
Electricity Demand $39,010 2,400 kW-months/year $16.25
Electricity Fees $492 - $ -
Natural Gas $9,068 1,967 MMBtu $4.61
TOTAL ENERGY COSTS $85,416
RECOMMENDED SAVINGS* $8,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$3,900
Cost:
$2,500
- - $3,900 543 - - - - - - - - -
-
kWh
$3,900
543
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,130
Cost:
$2,250
- - - - $2,130 449 - - - - - - -
-
kWh
-
-
kW-months/year
$2,130
449
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,000
Cost:
$390
$480 29,308 $1,520 217 - - - - - - - - $480
29,308
kWh
$1,520
217
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$520
Cost:
$750
$70 4,103 - - $450 94 - - - - - - $70
4,103
kWh
-
-
kW-months/year
$450
94
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20
Cost:
-
$90 5,569 $260 38 - - - - $(-110) - $(-220) - $90
5,569
kWh
$260
38
kW-months/year
-
-
MMBtu
-
-
lb
$(-110)
-
$
$(-220)
-
$
06: 3.6125 SELL COMBUSTIBLE WASTE Savings:
$330
Cost:
-
- - - - - - $330 20,200 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$330
20,200
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$8,900
Cost:
$5,890
$640 38,980 $5,680 798 $2,580 543 $330 20,200 $(-110) - $(-220) - $640
38,980
kWh
$5,680
798
kW-months/year
$2,580
543
MMBtu
$330
20,200
lb
$(-110)
-
$
$(-220)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost