IAC Assessment: CO0463
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0463
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2000
Principal Product flock transfers
NAICS n/a
SIC 2390 -
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 61,500
Annual Production 25,000,000 Pieces
Production Hrs. Annual 4,368
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $21,041 1,238,277 kWh $0.02
Electricity Demand $46,544 3,565 kW-months/year $13.06
Electricity Fees $192 - $ -
Natural Gas $30,266 7,155 MMBtu $4.23
TOTAL ENERGY COSTS $116,396
RECOMMENDED SAVINGS* $60,850 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,140
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $ $ $ $ Tgal
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,240
Cost:
$26,000
$5,010 301,290 $10,820 828 $(-5,590) (-1,284) - - - - - - - - - - - - $5,010
301,290
kWh
$10,820
828
kW-months/year
$(-5,590)
(-1,284)
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
Tgal
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,710
Cost:
$7,500
- - $4,710 360 - - - - - - - - - - - - - - -
-
kWh
$4,710
360
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
Tgal
03: 2.7314 REDUCE VENTILATION AIR Savings:
$1,500
Cost:
$1,900
$80 4,982 $310 24 $1,110 455 - - - - - - - - - - - - $80
4,982
kWh
$310
24
kW-months/year
$1,110
455
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
Tgal
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,260
Cost:
$1,260
$400 24,033 $860 66 - - - - - - - - - - - - - - $400
24,033
kWh
$860
66
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
Tgal
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$700
Cost:
$1,870
$160 9,965 $(-50) (-4) $590 136 - - - - - - - - - - - - $160
9,965
kWh
$(-50)
(-4)
kW-months/year
$590
136
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
Tgal
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$310
Cost:
$900
$190 11,723 $120 9 - - - - - - - - - - - - - - $190
11,723
kWh
$120
9
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
Tgal
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$200
Cost:
$410
$190 11,137 $400 31 - - - - - - $(-390) - - - - - - - $190
11,137
kWh
$400
31
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$(-390)
-
$
-
-
$
-
-
$
-
-
Tgal
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$150
Cost:
-
$410 24,326 $850 65 - - - - - - $(-320) - - - $(-790) - - - $410
24,326
kWh
$850
65
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$(-320)
-
$
-
-
$
$(-790)
-
$
-
-
Tgal
09: 3.5242 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE Savings:
$800
Cost:
$250
- - - - - - - 270 $1,050 270 - - - - $(-250) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
270
Tgal
$1,050
270
gal
-
-
$
-
-
$
$(-250)
-
$
-
-
Tgal
10: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$190
Cost:
$300
- - - - $40 8 $70 36,690 - - - - - - - - $80 - -
-
kWh
-
-
kW-months/year
$40
8
MMBtu
$70
36,690
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
$80
-
Tgal
11: 4.446 AUTOMATE FINISHING PROCESS Savings:
$37,380
Cost:
$30,000
- - - - - - - - - - $18,690 - - - $18,690 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$18,690
-
$
-
-
$
$18,690
-
$
-
-
Tgal
12: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$3,410
Cost:
$500
- - - - - - - - - - - - $3,410 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
$3,410
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$60,850
Cost:
$70,890
$6,440 387,456 $18,020 1,379 $(-3,850) (-685) $70 36,960 $1,050 270 $17,980 - $3,410 - $17,650 - $80 - $6,440
387,456
kWh
$18,020
1,379
kW-months/year
$(-3,850)
(-685)
MMBtu
$70
36,960
Tgal
$1,050
270
gal
$17,980
-
$
$3,410
-
$
$17,650
-
$
$80
-
Tgal
TOTAL IMPLEMENTED Savings:
$55,140
Cost:
$68,240
$6,360 382,474 $17,710 1,355 $(-4,960) (-1,140) $70 36,690 - - $17,980 - - - $17,900 - $80 - $6,360
382,474
kWh
$17,710
1,355
kW-months/year
$(-4,960)
(-1,140)
MMBtu
$70
36,690
Tgal
-
-
gal
$17,980
-
$
-
-
$
$17,900
-
$
$80
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption