IAC Assessment: CO0464
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0464
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2000
Principal Product corrugated packaging
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 143,000
Annual Production 13,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,685 2,521,395 kWh $0.02
Electricity Demand $76,967 5,847 kW-months/year $13.16
Electricity Fees $205 - $ -
Natural Gas $50,280 15,000 MMBtu $3.35
TOTAL ENERGY COSTS $(-60,919)
RECOMMENDED SAVINGS* $13,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,600
Cost:
$2,200
$2,230 122,802 $3,370 236 - - - - - - $2,230
122,802
kWh
$3,370
236
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,200
Cost:
$7,000
- - $4,200 294 - - - - - - -
-
kWh
$4,200
294
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,400
Cost:
$350
$700 38,687 $1,060 74 - - $(-360) - - - $700
38,687
kWh
$1,060
74
kW-months/year
-
-
lb
$(-360)
-
$
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,060
Cost:
-
$1,060 58,617 - - - - - - - - $1,060
58,617
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$620
Cost:
$100
$250 13,482 $370 26 - - - - - - $250
13,482
kWh
$370
26
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$470
Cost:
-
$800 43,669 $1,200 84 - - $(-140) - $(-1,390) - $800
43,669
kWh
$1,200
84
kW-months/year
-
-
lb
$(-140)
-
$
$(-1,390)
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$40
Cost:
-
- - - - $70 97 - - $(-30) - -
-
kWh
-
-
kW-months/year
$70
97
lb
-
-
$
$(-30)
-
$
TOTAL RECOMMENDED Savings:
$13,390
Cost:
$9,650
$5,040 277,257 $10,200 714 $70 97 $(-500) - $(-1,420) - $5,040
277,257
kWh
$10,200
714
kW-months/year
$70
97
lb
$(-500)
-
$
$(-1,420)
-
$
TOTAL IMPLEMENTED Savings:
$7,000
Cost:
$2,550
$2,930 161,489 $4,430 310 - - $(-360) - - - $2,930
161,489
kWh
$4,430
310
kW-months/year
-
-
lb
$(-360)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Ancillary Material Cost