Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2000 |
Principal Product | wood roof trusses |
NAICS | n/a |
SIC | 2439 - Structural Wood Members, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 52,250 |
Annual Production | 7,200,000 Thousand Feet |
Production Hrs. Annual | 4,680 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $12,548 | 373,974 | kWh | $0.03 |
Electricity Demand | $11,677 | 1,130 | kW-months/year | $10.33 |
Electricity Fees | $144 | - | $ | - |
Natural Gas | $10,230 | 2,138 | MMBtu | $4.78 |
TOTAL ENERGY COSTS | $47,151 | |||
RECOMMENDED SAVINGS* | $73,490 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $72,080 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $1,550 Cost: $1,610 |
$290 | 8,792 | - | - | $1,260 | 262 | - | - | - | - | - | - | - | - | - | - | - | - |
$290 8,792 kWh |
- - kW-months/year |
$1,260 262 MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $1,170 Cost: $1,200 |
- | - | $1,170 | 113 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$1,170 113 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $570 Cost: $310 |
$520 | 15,533 | $410 | 39 | - | - | - | - | - | - | $(-360) | - | - | - | - | - | - | - |
$520 15,533 kWh |
$410 39 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
$(-360) - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $240 Cost: $40 |
$140 | 4,103 | $100 | 10 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$140 4,103 kWh |
$100 10 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $90 Cost: - |
$130 | 3,810 | $100 | 10 | - | - | - | - | - | - | - | - | - | - | $(-140) | - | - | - |
$130 3,810 kWh |
$100 10 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
$(-140) - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $1,770 Cost: - |
- | - | - | - | - | - | $720 | - | - | - | - | - | $1,050 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$720 - lb |
- - lb |
- - $ |
$1,050 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $200 Cost: - |
- | - | - | - | - | - | - | - | $220 | 79 | - | - | - | - | $(-20) | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$220 79 lb |
- - $ |
- - $ |
$(-20) - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $58,970 Cost: $60,000 |
- | - | - | - | - | - | - | - | - | - | $58,970 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
$58,970 - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $5,620 Cost: $100 |
- | - | - | - | - | - | - | - | - | - | $5,620 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
$5,620 - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $3,310 Cost: $1,770 |
- | - | - | - | - | - | - | - | - | - | $70 | - | - | - | - | - | $3,240 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
$70 - $ |
- - $ |
- - $ |
$3,240 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $73,490 Cost: $65,030 |
$1,080 | 32,238 | $1,780 | 172 | $1,260 | 262 | $720 | - | $220 | 79 | $64,300 | - | $1,050 | - | $(-160) | - | $3,240 | - | $1,080 32,238 kWh |
$1,780 172 kW-months/year |
$1,260 262 MMBtu |
$720 - lb |
$220 79 lb |
$64,300 - $ |
$1,050 - $ |
$(-160) - $ |
$3,240 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $72,080 Cost: $63,790 |
$940 | 28,135 | $510 | 49 | $1,260 | 262 | $720 | - | $220 | 79 | $64,300 | - | $1,050 | - | $(-160) | - | $3,240 | - | $940 28,135 kWh |
$510 49 kW-months/year |
$1,260 262 MMBtu |
$720 - lb |
$220 79 lb |
$64,300 - $ |
$1,050 - $ |
$(-160) - $ |
$3,240 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Increase in Production |