Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2000
Principal Product wood roof trusses
NAICS n/a
SIC 2439 - Structural Wood Members, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 52,250
Annual Production 7,200,000 Thousand Feet
Production Hrs. Annual 4,680
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $12,548 373,974 kWh $0.03
Electricity Demand $11,677 1,130 kW-months/year $10.33
Electricity Fees $144 - $ -
Natural Gas $10,230 2,138 MMBtu $4.78
TOTAL ENERGY COSTS $47,151
RECOMMENDED SAVINGS* $73,490 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $72,080
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $ $ $ $ %
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,550
Cost:
$1,610
$290 8,792 - - $1,260 262 - - - - - - - - - - - - $290
8,792
kWh
-
-
kW-months/year
$1,260
262
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,170
Cost:
$1,200
- - $1,170 113 - - - - - - - - - - - - - - -
-
kWh
$1,170
113
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$570
Cost:
$310
$520 15,533 $410 39 - - - - - - $(-360) - - - - - - - $520
15,533
kWh
$410
39
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$(-360)
-
$
-
-
$
-
-
$
-
-
%
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$240
Cost:
$40
$140 4,103 $100 10 - - - - - - - - - - - - - - $140
4,103
kWh
$100
10
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$90
Cost:
-
$130 3,810 $100 10 - - - - - - - - - - $(-140) - - - $130
3,810
kWh
$100
10
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
$(-140)
-
$
-
-
%
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,770
Cost:
-
- - - - - - $720 - - - - - $1,050 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$720
-
lb
-
-
lb
-
-
$
$1,050
-
$
-
-
$
-
-
%
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$200
Cost:
-
- - - - - - - - $220 79 - - - - $(-20) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$220
79
lb
-
-
$
-
-
$
$(-20)
-
$
-
-
%
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$58,970
Cost:
$60,000
- - - - - - - - - - $58,970 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$58,970
-
$
-
-
$
-
-
$
-
-
%
09: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$5,620
Cost:
$100
- - - - - - - - - - $5,620 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$5,620
-
$
-
-
$
-
-
$
-
-
%
10: 4.4540 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$3,310
Cost:
$1,770
- - - - - - - - - - $70 - - - - - $3,240 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$70
-
$
-
-
$
-
-
$
$3,240
-
%
TOTAL RECOMMENDED Savings:
$73,490
Cost:
$65,030
$1,080 32,238 $1,780 172 $1,260 262 $720 - $220 79 $64,300 - $1,050 - $(-160) - $3,240 - $1,080
32,238
kWh
$1,780
172
kW-months/year
$1,260
262
MMBtu
$720
-
lb
$220
79
lb
$64,300
-
$
$1,050
-
$
$(-160)
-
$
$3,240
-
%
TOTAL IMPLEMENTED Savings:
$72,080
Cost:
$63,790
$940 28,135 $510 49 $1,260 262 $720 - $220 79 $64,300 - $1,050 - $(-160) - $3,240 - $940
28,135
kWh
$510
49
kW-months/year
$1,260
262
MMBtu
$720
-
lb
$220
79
lb
$64,300
-
$
$1,050
-
$
$(-160)
-
$
$3,240
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost Increase in Production