IAC logo
IAC Assessment: CO0470
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0470
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2000
Principal Product concrete pipe and ready mix concrete
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 41,848
Annual Production 23,763 Tons
Production Hrs. Annual 2,772
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $11,416 634,818 kWh $0.02
Electricity Demand $57,409 4,131 kW-months/year $13.90
Electricity Fees $834 - $ -
Natural Gas $12,455 2,522 MMBtu $4.94
TOTAL ENERGY COSTS $89,767
RECOMMENDED SAVINGS* $13,170 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,100
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,490
Cost:
$5,000
- - $2,490 180 - - - - - - - - - - -
-
kWh
$2,490
180
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,100
Cost:
$1,000
$230 12,603 $1,370 98 - - - - - - $(-500) - - - $230
12,603
kWh
$1,370
98
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$(-500)
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$790
Cost:
$180
- - - - $790 163 - - - - - - - - -
-
kWh
-
-
kW-months/year
$790
163
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$760
Cost:
$1,490
- - - - $760 157 - - - - - - - - -
-
kWh
-
-
kW-months/year
$760
157
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$520
Cost:
-
- - - - $520 96 - - - - - - - - -
-
kWh
-
-
kW-months/year
$520
96
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30
Cost:
-
$30 1,758 $110 8 - - - - $(-110) - - - - - $30
1,758
kWh
$110
8
kW-months/year
-
-
MMBtu
-
-
lb
$(-110)
-
$
-
-
$
-
-
$
07: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$4,200
Cost:
-
- - - - - - - - - - - - $4,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$4,200
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$550
Cost:
-
- - - - - - $550 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$550
-
lb
-
-
$
-
-
$
-
-
$
09: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,730
Cost:
$250
- - - - - - - - - - $2,730 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$2,730
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$13,170
Cost:
$7,920
$260 14,361 $3,970 286 $2,070 416 $550 - $(-110) - $2,230 - $4,200 - $260
14,361
kWh
$3,970
286
kW-months/year
$2,070
416
MMBtu
$550
-
lb
$(-110)
-
$
$2,230
-
$
$4,200
-
$
TOTAL IMPLEMENTED Savings:
$4,100
Cost:
$430
$30 1,758 $110 8 $790 163 $550 - $(-110) - $2,730 - - - $30
1,758
kWh
$110
8
kW-months/year
$790
163
MMBtu
$550
-
lb
$(-110)
-
$
$2,730
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost