Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2000 |
Principal Product | commercial riding mowers and attachments |
NAICS | n/a |
SIC | 3523 - Farm Machinery And Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 145 |
Plant Area (Sq.Ft.) | 116,000 |
Annual Production | 6,000 Pieces |
Production Hrs. Annual | 2,470 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $39,094 | 1,013,189 | kWh | $0.04 |
Electricity Demand | $49,107 | 4,096 | kW-months/year | $11.99 |
Natural Gas | $7,765 | 1,762 | MMBtu | $4.41 |
TOTAL ENERGY COSTS | $103,325 | |||
RECOMMENDED SAVINGS* | $81,790 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,630 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $4,320 Cost: $5,000 |
- | - | $4,320 | 360 | - | - | - | - | - | - |
- - kWh |
$4,320 360 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $710 Cost: $460 |
$280 | 7,327 | $430 | 36 | - | - | - | - | - | - |
$280 7,327 kWh |
$430 36 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $110 Cost: - |
$160 | 4,103 | $230 | 20 | - | - | - | - | $(-280) | - |
$160 4,103 kWh |
$230 20 kW-months/year |
- - lb |
- - $ |
$(-280) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $2,810 Cost: - |
- | - | - | - | $2,810 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,810 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING |
Savings: $73,840 Cost: $690,300 |
- | - | - | - | - | - | $42,480 | - | $31,360 | - |
- - kWh |
- - kW-months/year |
- - lb |
$42,480 - $ |
$31,360 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $81,790 Cost: $695,760 |
$440 | 11,430 | $4,980 | 416 | $2,810 | - | $42,480 | - | $31,080 | - | $440 11,430 kWh |
$4,980 416 kW-months/year |
$2,810 - lb |
$42,480 - $ |
$31,080 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,630 Cost: $460 |
$440 | 11,430 | $660 | 56 | $2,810 | - | - | - | $(-280) | - | $440 11,430 kWh |
$660 56 kW-months/year |
$2,810 - lb |
- - $ |
$(-280) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |