Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2000 |
Principal Product | aluminum extruded products |
NAICS | n/a |
SIC | 3354 - Aluminum Extruded Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 350,000 |
Annual Production | 82,400,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $466,706 | 21,188,453 | kWh | $0.02 |
Electricity Demand | $363,716 | 34,313 | kW-months/year | $10.60 |
Electricity Fees | $2,433 | - | $ | - |
Natural Gas | $1,049,642 | 322,586 | MMBtu | $3.25 |
TOTAL ENERGY COSTS | $2,266,359 | |||
RECOMMENDED SAVINGS* | $842,760 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $244,960 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $74,960 Cost: $1,050 |
- | - | - | - | $74,960 | 23,455 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$74,960 23,455 MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,150 Cost: $400 |
$3,710 | 168,230 | $2,440 | 230 | - | - | - | - | - | - | - | - | - | - |
$3,710 168,230 kWh |
$2,440 230 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $6,360 Cost: $10,000 |
- | - | $6,360 | 600 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$6,360 600 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,980 Cost: $1,000 |
$3,790 | 172,040 | $2,490 | 235 | - | - | - | - | $(-1,300) | - | - | - | - | - |
$3,790 172,040 kWh |
$2,490 235 kW-months/year |
- - MMBtu |
- - lb |
$(-1,300) - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $4,180 Cost: $6,780 |
$2,520 | 114,302 | $1,660 | 157 | - | - | - | - | - | - | - | - | - | - |
$2,520 114,302 kWh |
$1,660 157 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $1,260 Cost: $500 |
- | - | - | - | $1,260 | 394 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,260 394 MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE |
Savings: $107,610 Cost: $75,000 |
- | - | - | - | $760 | 238 | $16,690 | 198,600 | - | - | $90,160 | - | - | - |
- - kWh |
- - kW-months/year |
$760 238 MMBtu |
$16,690 198,600 lb |
- - $ |
$90,160 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE |
Savings: $39,460 Cost: $10,000 |
- | - | - | - | - | - | $39,460 | 441,900 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$39,460 441,900 lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $587,500 Cost: $262,500 |
- | - | - | - | $3,500 | 1,094 | - | - | - | - | $584,000 | - | - | - |
- - kWh |
- - kW-months/year |
$3,500 1,094 MMBtu |
- - lb |
- - $ |
$584,000 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $10,300 Cost: $26,000 |
- | - | $(-380) | (-36) | - | - | - | - | $10,580 | - | - | - | $100 | - |
- - kWh |
$(-380) (-36) kW-months/year |
- - MMBtu |
- - lb |
$10,580 - $ |
- - $ |
$100 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $842,760 Cost: $393,230 |
$10,020 | 454,572 | $12,570 | 1,186 | $80,480 | 25,181 | $56,150 | 640,500 | $9,280 | - | $674,160 | - | $100 | - | $10,020 454,572 kWh |
$12,570 1,186 kW-months/year |
$80,480 25,181 MMBtu |
$56,150 640,500 lb |
$9,280 - $ |
$674,160 - $ |
$100 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $244,960 Cost: $104,730 |
$10,020 | 454,572 | $12,950 | 1,222 | $76,980 | 24,087 | $56,150 | 640,500 | $(-1,300) | - | $90,160 | - | - | - | $10,020 454,572 kWh |
$12,950 1,222 kW-months/year |
$76,980 24,087 MMBtu |
$56,150 640,500 lb |
$(-1,300) - $ |
$90,160 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Water Consumption |