IAC logo
IAC Assessment: CO0473
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0473
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2000
Principal Product aluminum extruded products
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 350,000
Annual Production 82,400,000 Pounds
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $466,706 21,188,453 kWh $0.02
Electricity Demand $363,716 34,313 kW-months/year $10.60
Electricity Fees $2,433 - $ -
Natural Gas $1,049,642 322,586 MMBtu $3.25
TOTAL ENERGY COSTS $2,266,359
RECOMMENDED SAVINGS* $842,760 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $244,960
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Water Consumption
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ Tgal
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$74,960
Cost:
$1,050
- - - - $74,960 23,455 - - - - - - - - -
-
kWh
-
-
kW-months/year
$74,960
23,455
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,150
Cost:
$400
$3,710 168,230 $2,440 230 - - - - - - - - - - $3,710
168,230
kWh
$2,440
230
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$6,360
Cost:
$10,000
- - $6,360 600 - - - - - - - - - - -
-
kWh
$6,360
600
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,980
Cost:
$1,000
$3,790 172,040 $2,490 235 - - - - $(-1,300) - - - - - $3,790
172,040
kWh
$2,490
235
kW-months/year
-
-
MMBtu
-
-
lb
$(-1,300)
-
$
-
-
$
-
-
Tgal
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,180
Cost:
$6,780
$2,520 114,302 $1,660 157 - - - - - - - - - - $2,520
114,302
kWh
$1,660
157
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
06: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$1,260
Cost:
$500
- - - - $1,260 394 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,260
394
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
07: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$107,610
Cost:
$75,000
- - - - $760 238 $16,690 198,600 - - $90,160 - - - -
-
kWh
-
-
kW-months/year
$760
238
MMBtu
$16,690
198,600
lb
-
-
$
$90,160
-
$
-
-
Tgal
08: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$39,460
Cost:
$10,000
- - - - - - $39,460 441,900 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$39,460
441,900
lb
-
-
$
-
-
$
-
-
Tgal
09: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$587,500
Cost:
$262,500
- - - - $3,500 1,094 - - - - $584,000 - - - -
-
kWh
-
-
kW-months/year
$3,500
1,094
MMBtu
-
-
lb
-
-
$
$584,000
-
$
-
-
Tgal
10: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$10,300
Cost:
$26,000
- - $(-380) (-36) - - - - $10,580 - - - $100 - -
-
kWh
$(-380)
(-36)
kW-months/year
-
-
MMBtu
-
-
lb
$10,580
-
$
-
-
$
$100
-
Tgal
TOTAL RECOMMENDED Savings:
$842,760
Cost:
$393,230
$10,020 454,572 $12,570 1,186 $80,480 25,181 $56,150 640,500 $9,280 - $674,160 - $100 - $10,020
454,572
kWh
$12,570
1,186
kW-months/year
$80,480
25,181
MMBtu
$56,150
640,500
lb
$9,280
-
$
$674,160
-
$
$100
-
Tgal
TOTAL IMPLEMENTED Savings:
$244,960
Cost:
$104,730
$10,020 454,572 $12,950 1,222 $76,980 24,087 $56,150 640,500 $(-1,300) - $90,160 - - - $10,020
454,572
kWh
$12,950
1,222
kW-months/year
$76,980
24,087
MMBtu
$56,150
640,500
lb
$(-1,300)
-
$
$90,160
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Water Consumption