Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2000 |
Principal Product | air handling equip & fab metal parts |
NAICS | n/a |
SIC | 3444 - Sheet Metalwork |
Sales | $5,000,000-$10,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 104,000 |
Annual Production | 1,000 Tons |
Production Hrs. Annual | 2,184 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $8,887 | 513,189 | kWh | $0.02 |
Electricity Demand | $33,236 | 2,442 | kW-months/year | $13.61 |
Electricity Fees | $202 | - | $ | - |
Natural Gas | $10,279 | 2,226 | MMBtu | $4.62 |
TOTAL ENERGY COSTS | $53,719 | |||
RECOMMENDED SAVINGS* | $190,830 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,590 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,970 Cost: $17,900 |
$720 | 44,549 | $3,250 | 245 | - | - | - | - | - | - |
$720 44,549 kWh |
$3,250 245 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $3,190 Cost: $2,500 |
- | - | $3,190 | 240 | - | - | - | - | - | - |
- - kWh |
$3,190 240 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $3,180 Cost: $12,990 |
$(-100) | (-6,448) | $(-120) | (-9) | $3,400 | 556 | - | - | - | - |
$(-100) (-6,448) kWh |
$(-120) (-9) kW-months/year |
$3,400 556 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $400 Cost: $110 |
$140 | 8,499 | $620 | 27 | - | - | $(-360) | - | - | - |
$140 8,499 kWh |
$620 27 kW-months/year |
- - MMBtu |
$(-360) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $390 Cost: $60 |
$70 | 4,396 | $320 | 24 | - | - | - | - | - | - |
$70 4,396 kWh |
$320 24 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $179,700 Cost: - |
- | - | - | - | - | - | $(-69,900) | - | $249,600 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$(-69,900) - $ |
$249,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $190,830 Cost: $33,560 |
$830 | 50,996 | $7,260 | 527 | $3,400 | 556 | $(-70,260) | - | $249,600 | - | $830 50,996 kWh |
$7,260 527 kW-months/year |
$3,400 556 MMBtu |
$(-70,260) - $ |
$249,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,590 Cost: $2,610 |
$140 | 8,499 | $3,810 | 267 | - | - | $(-360) | - | - | - | $140 8,499 kWh |
$3,810 267 kW-months/year |
- - MMBtu |
$(-360) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Product |