Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2001 |
Principal Product | precision sheet metal components |
NAICS | n/a |
SIC | 3444 - Sheet Metalwork |
Sales | $10,000,000-$50,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 10,000,000 Pounds |
Production Hrs. Annual | 4,420 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $84,443 | 2,561,400 | kWh | $0.03 |
Electricity Demand | $69,154 | 15,278 | kW-months/year | $4.53 |
Electricity Fees | $4,368 | - | $ | - |
Natural Gas | $87,503 | 15,372 | MMBtu | $5.69 |
TOTAL ENERGY COSTS | $251,556 | |||
RECOMMENDED SAVINGS* | $23,590 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,210 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $11,370 Cost: $13,000 |
- | - | $11,370 | 1,606 | - | - | - | - | - | - |
- - kWh |
$11,370 1,606 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $5,240 Cost: $18,000 |
- | - | $5,240 | 720 | - | - | - | - | - | - |
- - kWh |
$5,240 720 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,950 Cost: $470 |
$3,320 | 71,200 | $1,410 | 193 | - | - | $(-780) | - | - | - |
$3,320 71,200 kWh |
$1,410 193 kW-months/year |
- - gal |
$(-780) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,350 Cost: $60 |
$950 | 20,400 | $400 | 55 | - | - | - | - | - | - |
$950 20,400 kWh |
$400 55 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $260 Cost: - |
$1,030 | 22,400 | $420 | 57 | - | - | $(-190) | - | $(-1,000) | - |
$1,030 22,400 kWh |
$420 57 kW-months/year |
- - gal |
$(-190) - $ |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8125 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER |
Savings: $1,420 Cost: $1,150 |
- | - | - | - | $140 | 55 | $690 | - | $590 | - |
- - kWh |
- - kW-months/year |
$140 55 gal |
$690 - $ |
$590 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $23,590 Cost: $32,680 |
$5,300 | 114,000 | $18,840 | 2,631 | $140 | 55 | $(-280) | - | $(-410) | - | $5,300 114,000 kWh |
$18,840 2,631 kW-months/year |
$140 55 gal |
$(-280) - $ |
$(-410) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,210 Cost: $470 |
$4,350 | 93,600 | $1,830 | 250 | - | - | $(-970) | - | $(-1,000) | - | $4,350 93,600 kWh |
$1,830 250 kW-months/year |
- - gal |
$(-970) - $ |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost |