IAC Assessment: CO0487
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0487
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2001
Principal Product precision sheet metal components
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 125,000
Annual Production 10,000,000 Pounds
Production Hrs. Annual 4,420
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,443 2,561,400 kWh $0.03
Electricity Demand $69,154 15,278 kW-months/year $4.53
Electricity Fees $4,368 - $ -
Natural Gas $87,503 15,372 MMBtu $5.69
TOTAL ENERGY COSTS $251,556
RECOMMENDED SAVINGS* $23,590 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,210
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,370
Cost:
$13,000
- - $11,370 1,606 - - - - - - -
-
kWh
$11,370
1,606
kW-months/year
-
-
gal
-
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,240
Cost:
$18,000
- - $5,240 720 - - - - - - -
-
kWh
$5,240
720
kW-months/year
-
-
gal
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,950
Cost:
$470
$3,320 71,200 $1,410 193 - - $(-780) - - - $3,320
71,200
kWh
$1,410
193
kW-months/year
-
-
gal
$(-780)
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,350
Cost:
$60
$950 20,400 $400 55 - - - - - - $950
20,400
kWh
$400
55
kW-months/year
-
-
gal
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$260
Cost:
-
$1,030 22,400 $420 57 - - $(-190) - $(-1,000) - $1,030
22,400
kWh
$420
57
kW-months/year
-
-
gal
$(-190)
-
$
$(-1,000)
-
$
06: 3.8125 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER Savings:
$1,420
Cost:
$1,150
- - - - $140 55 $690 - $590 - -
-
kWh
-
-
kW-months/year
$140
55
gal
$690
-
$
$590
-
$
TOTAL RECOMMENDED Savings:
$23,590
Cost:
$32,680
$5,300 114,000 $18,840 2,631 $140 55 $(-280) - $(-410) - $5,300
114,000
kWh
$18,840
2,631
kW-months/year
$140
55
gal
$(-280)
-
$
$(-410)
-
$
TOTAL IMPLEMENTED Savings:
$4,210
Cost:
$470
$4,350 93,600 $1,830 250 - - $(-970) - $(-1,000) - $4,350
93,600
kWh
$1,830
250
kW-months/year
-
-
gal
$(-970)
-
$
$(-1,000)
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost