Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2001 |
Principal Product | Beef |
NAICS | n/a |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $10,000,000-$50,000,000 |
# of Employees | 69 |
Plant Area (Sq.Ft.) | 67,000 |
Annual Production | 5,200,000 Pounds |
Production Hrs. Annual | 2,080 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $34,341 | 2,084,600 | kWh | $0.02 |
Electricity Demand | $62,207 | 4,492 | kW-months/year | $13.85 |
Electricity Fees | $1,621 | - | $ | - |
Natural Gas | $9,153 | 1,827 | MMBtu | $5.01 |
TOTAL ENERGY COSTS | $129,420 | |||
RECOMMENDED SAVINGS* | $19,070 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,070 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $6,590 Cost: $17,000 |
- | - | $6,590 | 480 | - | - | - | - | - | - | - | - |
- - kWh |
$6,590 480 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,860 Cost: $500 |
$590 | 36,200 | $1,270 | 93 | - | - | - | - | - | - | - | - |
$590 36,200 kWh |
$1,270 93 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION |
Savings: $470 Cost: $500 |
$470 | 29,000 | - | - | - | - | - | - | - | - | - | - |
$470 29,000 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $250 Cost: - |
$350 | 21,700 | $920 | 67 | - | - | $(-340) | - | $(-680) | - | - | - |
$350 21,700 kWh |
$920 67 kW-months/year |
- - lb |
$(-340) - $ |
$(-680) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $9,900 Cost: $1,000 |
- | - | - | - | $5,700 | - | $(-1,790) | - | - | - | $5,990 | - |
- - kWh |
- - kW-months/year |
$5,700 - lb |
$(-1,790) - $ |
- - $ |
$5,990 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $19,070 Cost: $19,000 |
$1,410 | 86,900 | $8,780 | 640 | $5,700 | - | $(-2,130) | - | $(-680) | - | $5,990 | - | $1,410 86,900 kWh |
$8,780 640 kW-months/year |
$5,700 - lb |
$(-2,130) - $ |
$(-680) - $ |
$5,990 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,070 Cost: $19,000 |
$1,410 | 86,900 | $8,780 | 640 | $5,700 | - | $(-2,130) | - | $(-680) | - | $5,990 | - | $1,410 86,900 kWh |
$8,780 640 kW-months/year |
$5,700 - lb |
$(-2,130) - $ |
$(-680) - $ |
$5,990 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | By-product Production |