IAC logo
IAC Assessment: CO0498
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0498
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2001
Principal Product Natural gas compressors and wheelchair lifts
NAICS n/a
SIC 3563 - Air And Gas Compressors
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 56,600
Annual Production 35 Pieces
Production Hrs. Annual 2,496
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $13,321 798,400 kWh $0.02
Electricity Demand $38,803 2,868 kW-months/year $13.53
Electricity Fees $196 - $ -
Natural Gas $51,920 7,072 MMBtu $7.34
TOTAL ENERGY COSTS $104,240
RECOMMENDED SAVINGS* $81,190 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,200
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$3,880
Cost:
$7,000
- - $3,880 288 - - - - - - -
-
kWh
$3,880
288
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,910
Cost:
$5,800
- - - - $2,910 510 - - - - -
-
kWh
-
-
kW-months/year
$2,910
510
MMBtu
-
-
$
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,110
Cost:
$7,530
- - - - $2,110 369 - - - - -
-
kWh
-
-
kW-months/year
$2,110
369
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$410
Cost:
-
$1,040 62,100 $3,770 280 - - $(-1,370) - $(-3,030) - $1,040
62,100
kWh
$3,770
280
kW-months/year
-
-
MMBtu
$(-1,370)
-
$
$(-3,030)
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$380
Cost:
$210
$280 16,600 $700 52 - - $(-600) - - - $280
16,600
kWh
$700
52
kW-months/year
-
-
MMBtu
$(-600)
-
$
-
-
$
06: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$71,500
Cost:
$3,200
- - - - - - $71,500 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$71,500
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$81,190
Cost:
$23,740
$1,320 78,700 $8,350 620 $5,020 879 $69,530 - $(-3,030) - $1,320
78,700
kWh
$8,350
620
kW-months/year
$5,020
879
MMBtu
$69,530
-
$
$(-3,030)
-
$
TOTAL IMPLEMENTED Savings:
$75,200
Cost:
$9,210
$1,320 78,700 $4,470 332 $2,910 510 $69,530 - $(-3,030) - $1,320
78,700
kWh
$4,470
332
kW-months/year
$2,910
510
MMBtu
$69,530
-
$
$(-3,030)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost