IAC Assessment: CO0501
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0501
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2002
Principal Product aerospace hardware
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 162,000
Annual Production 304,000 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $254,357 16,700,444 kWh $0.02
Electricity Demand $382,855 58,158 kW-months/year $6.58
Electricity Fees $1,509 - $ -
Natural Gas $233,887 39,190 MMBtu $5.97
TOTAL ENERGY COSTS $929,890
RECOMMENDED SAVINGS* $192,030 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$18,890
Cost:
$12,000
- - $18,890 2,940 - - - - - - - - -
-
kWh
$18,890
2,940
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,610
Cost:
$1,980
$5,490 347,700 $6,120 899 - - - - - - - - $5,490
347,700
kWh
$6,120
899
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,180
Cost:
$10,000
$5,540 351,700 $3,640 482 - - - - - - - - $5,540
351,700
kWh
$3,640
482
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,020
Cost:
$2,000
$2,370 150,400 $2,650 414 - - - - - - - - $2,370
150,400
kWh
$2,650
414
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,440
Cost:
$2,000
$3,440 218,100 - - - - - - - - - - $3,440
218,100
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$2,900
Cost:
-
$1,230 77,900 $1,670 225 - - - - - - - - $1,230
77,900
kWh
$1,670
225
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$620
Cost:
$500
$310 19,800 $310 41 - - - - - - - - $310
19,800
kWh
$310
41
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
08: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$137,140
Cost:
$300,000
- - - - - - $15,000 21,500 $112,320 - $9,820 - -
-
kWh
-
-
kW-months/year
-
-
gal
$15,000
21,500
lb
$112,320
-
$
$9,820
-
$
09: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$3,230
Cost:
$6,500
- - - - $3,230 - - - - - - - -
-
kWh
-
-
kW-months/year
$3,230
-
gal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$192,030
Cost:
$334,980
$18,380 1,165,600 $33,280 5,001 $3,230 - $15,000 21,500 $112,320 - $9,820 - $18,380
1,165,600
kWh
$33,280
5,001
kW-months/year
$3,230
-
gal
$15,000
21,500
lb
$112,320
-
$
$9,820
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost