IAC Assessment: CO0502
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2002
Principal Product Injection molded plastic parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 26,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,259 1,938,056 kWh $0.02
Electricity Demand $46,444 4,225 kW-months/year $10.99
Electricity Fees $336 - $ -
Natural Gas $6,789 791 MMBtu $8.58
TOTAL ENERGY COSTS $86,828
RECOMMENDED SAVINGS* $14,660 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,420
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,320
Cost:
$53,800
$4,650 291,700 $5,670 499 - - - - $4,650
291,700
kWh
$5,670
499
kW-months/year
-
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,090
Cost:
$6,200
- - $2,570 240 $(-480) - - - -
-
kWh
$2,570
240
kW-months/year
$(-480)
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,060
Cost:
$1,050
$720 45,100 $700 62 - - - - $720
45,100
kWh
$700
62
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$830
Cost:
-
$600 37,600 $1,120 99 - - $(-1,250) - $600
37,600
kWh
$1,120
99
kW-months/year
-
-
$
$(-1,250)
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$360
Cost:
$30
$180 11,400 $180 16 - - - - $180
11,400
kWh
$180
16
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$14,660
Cost:
$61,080
$6,150 385,800 $10,240 916 $(-480) - $(-1,250) - $6,150
385,800
kWh
$10,240
916
kW-months/year
$(-480)
-
$
$(-1,250)
-
$
TOTAL IMPLEMENTED Savings:
$1,420
Cost:
$1,080
$900 56,500 $880 78 - - - - $900
56,500
kWh
$880
78
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost