IAC logo
IAC Assessment: CO0503
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0503
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2002
Principal Product Assembled electronic components
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $100,000,000-$500,000,000
# of Employees 1,080
Plant Area (Sq.Ft.) 360,000
Annual Production 865,600 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $562,372 15,681,280 kWh $0.04
Electricity Demand $156,005 26,000 kW-months/year $6.00
Electricity Fees $2,454 - $ -
Natural Gas $162,056 19,513 MMBtu $8.31
TOTAL ENERGY COSTS $882,887
RECOMMENDED SAVINGS* $106,041 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,338
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$51,590
Cost:
$6,250
$38,600 1,033,100 $12,990 1,683 - - - - - - $38,600
1,033,100
kWh
$12,990
1,683
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$25,940
Cost:
-
$25,940 663,700 - - - - - - - - $25,940
663,700
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,053
Cost:
-
$30,900 822,000 $10,370 1,344 $(-1,902) - $(-27,315) - - - $30,900
822,000
kWh
$10,370
1,344
kW-months/year
$(-1,902)
-
$
$(-27,315)
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,310
Cost:
$430
$5,830 157,500 $1,660 216 $(-180) - - - - - $5,830
157,500
kWh
$1,660
216
kW-months/year
$(-180)
-
$
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,730
Cost:
$870
$2,900 78,300 $830 107 - - - - - - $2,900
78,300
kWh
$830
107
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,760
Cost:
$3,360
$2,760 74,500 - - - - - - - - $2,760
74,500
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$498
Cost:
$946
$380 10,240 $118 15 - - - - - - $380
10,240
kWh
$118
15
kW-months/year
-
-
$
-
-
$
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,160
Cost:
$2,040
$1,150 31,100 $910 118 - - - - $100 - $1,150
31,100
kWh
$910
118
kW-months/year
-
-
$
-
-
$
$100
-
$
TOTAL RECOMMENDED Savings:
$106,041
Cost:
$13,896
$108,460 2,870,440 $26,878 3,483 $(-2,082) - $(-27,315) - $100 - $108,460
2,870,440
kWh
$26,878
3,483
kW-months/year
$(-2,082)
-
$
$(-27,315)
-
$
$100
-
$
TOTAL IMPLEMENTED Savings:
$85,338
Cost:
$7,626
$70,750 1,864,540 $14,768 1,914 $(-180) - - - - - $70,750
1,864,540
kWh
$14,768
1,914
kW-months/year
$(-180)
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost