Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2002 |
Principal Product | Specialty bolts, track spikes for railroads |
NAICS | n/a |
SIC | 3452 - Bolts, Nuts, Rivets, And Washers |
Sales | $5,000,000-$10,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 48,750 |
Annual Production | 10,000,000 Pounds |
Production Hrs. Annual | 4,420 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $118,540 | 2,416,050 | kWh | $0.05 |
Electricity Demand | $84,183 | 9,803 | kW-months/year | $8.59 |
Natural Gas | $130,798 | 35,466 | MMBtu | $3.69 |
TOTAL ENERGY COSTS | $337,681 | |||
RECOMMENDED SAVINGS* | $159,210 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,640 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,450 Cost: $90 |
$3,260 | 66,600 | $1,550 | 181 | - | - | $(-360) | - | - | - |
$3,260 66,600 kWh |
$1,550 181 kW-months/year |
- - gal |
$(-360) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $4,230 Cost: $7,000 |
- | - | $4,230 | 492 | - | - | - | - | - | - |
- - kWh |
$4,230 492 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,570 Cost: $23,500 |
$2,460 | 50,300 | $1,110 | 129 | - | - | - | - | - | - |
$2,460 50,300 kWh |
$1,110 129 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $31,960 Cost: $1,620 |
- | - | - | - | $3,330 | 6,400 | - | - | $28,630 | - |
- - kWh |
- - kW-months/year |
$3,330 6,400 gal |
- - $ |
$28,630 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL |
Savings: $115,000 Cost: $100,000 |
- | - | - | - | - | - | $120,000 | - | $(-5,000) | - |
- - kWh |
- - kW-months/year |
- - gal |
$120,000 - $ |
$(-5,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $159,210 Cost: $132,210 |
$5,720 | 116,900 | $6,890 | 802 | $3,330 | 6,400 | $119,640 | - | $23,630 | - | $5,720 116,900 kWh |
$6,890 802 kW-months/year |
$3,330 6,400 gal |
$119,640 - $ |
$23,630 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,640 Cost: $8,710 |
$3,260 | 66,600 | $5,780 | 673 | $3,330 | 6,400 | $(-360) | - | $28,630 | - | $3,260 66,600 kWh |
$5,780 673 kW-months/year |
$3,330 6,400 gal |
$(-360) - $ |
$28,630 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost |