IAC Assessment: CO0509
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0509
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2002
Principal Product Mining conveyor idlers
NAICS n/a
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 88,500
Annual Production 7,500,000 Pounds
Production Hrs. Annual 2,210
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,989 837,000 kWh $0.03
Electricity Demand $29,629 3,536 kW-months/year $8.38
Electricity Fees $1,245 - $ -
Natural Gas $7,658 1,379 MMBtu $5.55
TOTAL ENERGY COSTS $69,821
RECOMMENDED SAVINGS* $35,080 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,910
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,920
Cost:
$8,000
- - $2,920 348 - - - - - - -
-
kWh
$2,920
348
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,620
Cost:
$230
$950 31,800 $1,450 173 - - $(-780) - - - $950
31,800
kWh
$1,450
173
kW-months/year
-
-
lb
$(-780)
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$640
Cost:
$2,260
$250 8,500 $390 46 - - - - - - $250
8,500
kWh
$390
46
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$610
Cost:
$1,920
$240 8,100 $370 44 - - - - - - $240
8,100
kWh
$370
44
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$17,700
Cost:
$2,000
- - - - $1,890 6,300 - - $15,810 - -
-
kWh
-
-
kW-months/year
$1,890
6,300
lb
-
-
$
$15,810
-
$
06: 3.2176 INCREASE USE OF AUTOMATION Savings:
$9,140
Cost:
$1,600
- - - - $540 1,800 - - $8,600 - -
-
kWh
-
-
kW-months/year
$540
1,800
lb
-
-
$
$8,600
-
$
07: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$2,450
Cost:
$1,330
- - - - - 4,500 - - $2,450 - -
-
kWh
-
-
kW-months/year
-
4,500
lb
-
-
$
$2,450
-
$
TOTAL RECOMMENDED Savings:
$35,080
Cost:
$17,340
$1,440 48,400 $5,130 611 $2,430 12,600 $(-780) - $26,860 - $1,440
48,400
kWh
$5,130
611
kW-months/year
$2,430
12,600
lb
$(-780)
-
$
$26,860
-
$
TOTAL IMPLEMENTED Savings:
$30,910
Cost:
$5,160
$950 31,800 $1,450 173 $2,430 12,600 $(-780) - $26,860 - $950
31,800
kWh
$1,450
173
kW-months/year
$2,430
12,600
lb
$(-780)
-
$
$26,860
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost