IAC Assessment: CO0513
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0513
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2002
Principal Product Ground mineral products
NAICS n/a
SIC 3295 - Minerals, Ground Or Treated
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 149,000
Annual Production 120,000 Tons
Production Hrs. Annual 8,760
Location (State) MT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $889,694 17,342,849 kWh $0.05
Electricity Demand $54,025 37,308 kW-months/year $1.45
Electricity Fees $2,328 - $ -
Natural Gas $1,136,554 220,820 MMBtu $5.15
TOTAL ENERGY COSTS $2,082,601
RECOMMENDED SAVINGS* $22,489 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,420
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,879
Cost:
$3,496
$1,806 36,802 $73 50 - - - - $1,806
36,802
kWh
$73
50
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,450
Cost:
$2,540
$8,120 165,500 $330 227 - - - - $8,120
165,500
kWh
$330
227
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,980
Cost:
$1,120
- - - - $5,980 1,214 - - -
-
kWh
-
-
kW-months/year
$5,980
1,214
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,760
Cost:
$11,070
$5,040 102,700 $220 154 - - $(-1,500) - $5,040
102,700
kWh
$220
154
kW-months/year
-
-
MMBtu
$(-1,500)
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,420
Cost:
$600
$3,020 61,400 $120 84 - - $(-720) - $3,020
61,400
kWh
$120
84
kW-months/year
-
-
MMBtu
$(-720)
-
$
TOTAL RECOMMENDED Savings:
$22,489
Cost:
$18,826
$17,986 366,402 $743 515 $5,980 1,214 $(-2,220) - $17,986
366,402
kWh
$743
515
kW-months/year
$5,980
1,214
MMBtu
$(-2,220)
-
$
TOTAL IMPLEMENTED Savings:
$2,420
Cost:
$600
$3,020 61,400 $120 84 - - $(-720) - $3,020
61,400
kWh
$120
84
kW-months/year
-
-
MMBtu
$(-720)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes